Please retain product label and instructions for future reference
IMPORTANT:
Pre-drill before fixing screws.
Pre drill
hole
80mm
bolt
66
66
Step 52
Parts needed - No. 66 QTY 14
Arrange the storm braces (
No. 66
) around
the building (
internally
). Place 2x storm
braces per side fixing into place using 2x
80mm bolts per brace making sure the
washer & nut are tightened from the
outside of the building.
*Ensure the storm braces are secured at
the highest point possible on each side.
The storm braces will need to be altered
during the buildings life as the moisture
content within the log boards changes.
The boards will expand during periods of
high moisture (Winter) and shrink during
periods of low moisture (Summer.)
**Storm braces will help your building
expand and contract properly.
***It is important that each bolt is
tightened using a washer so as not to
damage the log boards.
28x80mm Bolt Sets
Step 53
Parts Needed: No. 6 QTY 2
No. 16 QTY 1
No. 80 QTY 1
Attach the Rain Guards
(No.6)
to the window frame, fixing in place onto the
framing above each window using 3x70mm screws per rain guard.
Attach the Rain Guard
(No.16)
to the double door frame, fixing in place
onto the framing above the Double Door using 3x70mm screws.
Attach the Rain Guard
(No.80)
to the single door frame, fixing in place onto
the framing above the Single Door using 3x70mm screws.
12x70mm Screws.
70mm
screw
Pre drill
hole
6
6
16
6
80
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.