P 12
Step 14
Parts needed - No. 23 QTY 6
No. 24 QTY 6
No. 29 QTY 12
No. 30 QTY 6
No. 31 QTY 6
Lay the next 6 boards (
No. 23, 24, 29, 30, 31, 41, 83, 86 & 87
) onto the log cabin to create your
second level, following the method as shown in the illustration.
*Ensure that the boards are level and flush with each other as you lay each one.
Ensure the boards
(No.83 & 87)
are level, flush and in line with the boards next to them.
Secure every other board
(No. 83 & 87)
in place by screwing through the side of the board at an
angle into the end of the board next to it
(No. 41 & 29)
, using 1x60mm screw per board.
6x60mm Screws
Left Handed
Right Handed
24
23
41
29
83
87
86
41
41
83
87
86
41
41
29
29
41
23
24
30
31
29
30
31
Rubber Mallet
may be required
to fit parts.
No. 41 QTY 18
No. 83 QTY 6
No. 86 QTY 6
No. 87 QTY 6
Pre drill
hole
80mm
screw
IMPORTANT :
Pre-drill before fixing screws.
2
4
IMPORTANT :
Pre-drill before fixing screws.
Step 15
Parts Needed - No. 2 QTY 2
No. 3 QTY 2
No. 4 QTY 2
No. 5 QTY 2
Arrange the left, right, top & bottom window
frames (
No’s. 2, 3, 4,& 5
) onto a firm and level
surface. Secure the top and bottom frames to
the uprights using 2x80mm screw per corner,
ensuring the screws do
NOT
protrude through
the front of the window framing.
Use this method to construct 2 window
frames.
16x80mm Screws
Pre drill
hole
80mm
screw
5
3
5
3
The internal lip of the window
frame should be positioned on
the inside of the building.
Please retain product label and instructions for future reference