P 14

Please retain product label and instructions for future reference

             

Roof

Closure Trim

Internal

23

*Measure and cut the

closure trims to

fit the internal space.

Roof

Closure Trim

Internal

42

*Measure and cut the

closure trims to

fit the internal space.

Pre drill 

hole

30mm 

screw

*

trim to fit

Step 25

Parts needed - No. 42 QTY 6 

   

 

Inside the building place the closure 

trim (

No. 42

) against the boarding 

and align with the roof as shown in 

the illustration.

*Measure and cut the closure trims 

to fit the internal space.

Once in position fix each trim 

into place by pre drilling a pilot hole 

and using 6x30mm screws per trim, 

equally spacing them along the face 

of the board.

36x30mm Screws

IMPORTANT: 

Pre-drill before fixing screws.

23

23

42

42

30mm 

screw

Pre drill 

hole

*

Cut to fit

Step 26

Parts needed - No. 42 QTY 6 

Once the floor has been laid arrange the

closure trim (

No. 42

) around the outside 

edge of floor (

internally

), measure and cut 

down accordingly to best match the 

internal space.

Secure each trim section into place using 

6x30mm spaced equally along the board 

as shown in the illustration.

*Do NOT fix the closure trim to the floor

boards.

36x30mm Screws

 

IMPORTANT: 

Pre-drill before fixing screws.

HANDLE

WITH CARE

1

2

3

4

Felt 

tacks 

Step 27

Parts needed - No. 44

Cut the felt 

(No. 44) 

into five 

strips & lay onto the roof in the 

order shown in the illustration.

*Ensure there is approximately 

50mm of overhanging felt each 

side.

Once the felt is laid out fix to the 

roof using felt tacks at 100mm

intervals.

*Felt size: 3500mm

250x Felt Tacks

1.

2.

3.

4.

5.

44

Summary of Contents for 0628AXNE0403HGDD1SW-V1

Page 1: ...s of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60...

Page 2: ...w Frame Top 84x125x805mm QTY 1 AI 0628LOGWTF V3 Window Frame Bottom 71x70x805mm QTY 1 AI 0628LOGWBF V3 7 8 Casement Stay QTY 1 PI 07 0187 Flag Hinge QTY 2 PI 07 0211 Double Door Contents 10 9 11 12 Mo...

Page 3: ...TY 2 F4444 2804 PT 34 Bearer 44x44x3720mm QTY 9 F4444 3720 PT 35 Roof Purlin 45x120x3396mm QTY 3 F45120 AE 3396 36 Fascia 16x120x2118mm QTY 4 S16120 G 2118 Angled 38 Eaves Frame 27x44x3396mm QTY 2 F27...

Page 4: ...rer is flush Once fully assembled ensure the bearers are square by measuring from corner to corner as illustrated making sure the measurements are equal If the bearers are not aligned equally unscrew...

Page 5: ...ation 4x70mm Screws Pre drill hole 70mm screw IMPORTANT Pre drill before fixing screws 23 23 27 27 23 24 27 27 28 26 24 Step 4 Parts needed No 24 QTY 6 No 26 QTY 6 No 27 QTY 12 No 28 QTY 6 Following t...

Page 6: ...ace the master and secondary doors No s 9 10 onto a flat surface and fix the Adjustable door hinge No 17c to the doors using 3x30mm screws per hinge Fix 3 x Adjustable Door Hinges No 17a b into positi...

Page 7: ...embled the door frame refer to step 5 Please note This image is for illustrative purposes and may differ from your choice in product regarding door position Nevertheless the process of fitting the doo...

Page 8: ...the female part of the flag hinge No 7 to the window using 4x30mm screws attach the male part of the flag hinge No 7 to the window frame using 4x30mm screws ensuring that the window can open and clos...

Page 9: ...e last two boards No s 28 43 onto the front and back of the log cabin Once in position place log board No 29 onto the top of the overhang fixing into position by screwing through the notches as shown...

Page 10: ...ng 3x40mm screws Ensure the roof boards are not laid too close together use the spacers No 45 provided to create a 2mm gap Adjusting the spacing between the boards allows the wood to swell in damp wea...

Page 11: ...from your choice in product Nevertheless the process of fixing the eaves frames is thesame 18x40mm Screws Step 19 Lift each window onto the already existing hooks on the window frame ensuring the hook...

Page 12: ...o 20 to the secondary door No 10 with 4x30mm screws Fit the door handles No 18 and connect with the metalbar to the mortice lock using 8x30mm screws Ensure the lock mechanism closes correctly If not r...

Page 13: ...4 Parts needed No 40 QTY 35 Place the first floor board No 40 inside the building flush to the log board on the wall Continue adding the floor boards internally making sure to interlock each individua...

Page 14: ...0mm Screws IMPORTANT Pre drill before fixing screws 23 23 42 42 30mm screw Pre drill hole Cut to fit Step 26 Parts needed No 42 QTY 6 Once the floor has been laid arrange the closure trim No 42 around...

Page 15: ...rrange the storm braces No 41 around the building internally Placing two storm braces per side fixing into place using 2x 70mm bolts per brace making sure the washer nut are tightened from the outside...

Page 16: ...n Guards No 6 to the Window frame fixing in place onto the framing above the window using 3x70mm screws per guard Attach the Rain Guard No 16 to the Door frame fixing in place onto the framing above t...

Reviews: