IMPORTANT : 

Pre-drill before fixing screws.

35

35

Pre drill 

hole

Step 16

Parts needed - No. 35 QTY 3

 

Align the Roof Purlin(

s

) (

No. 

35

) into the cut out slots on each 

gable top ensuring each purlin 

interlocks the boards.

 

Secure the purlins at each 

end by screwing through the purlins 

into the boards (

ensure to pre-drill 

to avoid the boards splitting

) using 

4x70mm screws per purlin.

*Please note:

 The gable shown is for 

illustrative purposes and may differ  in 

width from your choice in product. 

Nevertheless, despite any differences 

the process of fixing the purlins  is the 

same.

12x70mm Screws

70mm 

screw

a

b

a

35

b

35

Rubber Mallet 

may be required 

to fit parts.

Step 17

Parts needed - No. 39 QTY 64

 

Place the first two roof board’s 

(

No.39

) onto the log cabin on each side, 

making sure the boards are flush to the 

end of the roof purlin. Once in position fix 

to each purlin using 3x40mm screws.

Ensure the roof boards are not laid too 

close together, use the spacers 

(No.45) 

provided to create a 2mm gap. Adjusting 

the spacing between the boards allows the 

wood to swell in damp weather.

Continue adding the roof boards along the 

roof, fixing each one into position using 

3x40mm screws, making sure that each 

board is  interlocked, flush at the bottom & 

meet at the top of the apex.

You have been issued with 64 roof boards, 

however you may only need to use 62.

*Ensure the roof boards meet at the top 

of the apex and leave an overhang at the 

bottom.

 

The last board on each side will 

overhang past the end of the purlins: 

Using a straight edge and a pencil mark 

out a line as a guide. 

Cut along the pencil mark and remove the 

excess. Place the cut down board’s back 

onto the roof and secure into place using 

3x40mm screws per board.

*Please Note: 

This image is for 

illustrative purposes and may differ from 

your choice in product. 

Nevertheless the process of cutting and 

fitting the last roof boards is the same.

192x40mm Screws 

40mm 

screw

Pre drill 

hole

*

Cut to fit

a

b

IMPORTANT : 

Pre-drill before fixing screws.

23b

39

39

39

b

a

Summary of Contents for 0628AXNE0403HGDD1SW-V1

Page 1: ...s of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60...

Page 2: ...w Frame Top 84x125x805mm QTY 1 AI 0628LOGWTF V3 Window Frame Bottom 71x70x805mm QTY 1 AI 0628LOGWBF V3 7 8 Casement Stay QTY 1 PI 07 0187 Flag Hinge QTY 2 PI 07 0211 Double Door Contents 10 9 11 12 Mo...

Page 3: ...TY 2 F4444 2804 PT 34 Bearer 44x44x3720mm QTY 9 F4444 3720 PT 35 Roof Purlin 45x120x3396mm QTY 3 F45120 AE 3396 36 Fascia 16x120x2118mm QTY 4 S16120 G 2118 Angled 38 Eaves Frame 27x44x3396mm QTY 2 F27...

Page 4: ...rer is flush Once fully assembled ensure the bearers are square by measuring from corner to corner as illustrated making sure the measurements are equal If the bearers are not aligned equally unscrew...

Page 5: ...ation 4x70mm Screws Pre drill hole 70mm screw IMPORTANT Pre drill before fixing screws 23 23 27 27 23 24 27 27 28 26 24 Step 4 Parts needed No 24 QTY 6 No 26 QTY 6 No 27 QTY 12 No 28 QTY 6 Following t...

Page 6: ...ace the master and secondary doors No s 9 10 onto a flat surface and fix the Adjustable door hinge No 17c to the doors using 3x30mm screws per hinge Fix 3 x Adjustable Door Hinges No 17a b into positi...

Page 7: ...embled the door frame refer to step 5 Please note This image is for illustrative purposes and may differ from your choice in product regarding door position Nevertheless the process of fitting the doo...

Page 8: ...the female part of the flag hinge No 7 to the window using 4x30mm screws attach the male part of the flag hinge No 7 to the window frame using 4x30mm screws ensuring that the window can open and clos...

Page 9: ...e last two boards No s 28 43 onto the front and back of the log cabin Once in position place log board No 29 onto the top of the overhang fixing into position by screwing through the notches as shown...

Page 10: ...ng 3x40mm screws Ensure the roof boards are not laid too close together use the spacers No 45 provided to create a 2mm gap Adjusting the spacing between the boards allows the wood to swell in damp wea...

Page 11: ...from your choice in product Nevertheless the process of fixing the eaves frames is thesame 18x40mm Screws Step 19 Lift each window onto the already existing hooks on the window frame ensuring the hook...

Page 12: ...o 20 to the secondary door No 10 with 4x30mm screws Fit the door handles No 18 and connect with the metalbar to the mortice lock using 8x30mm screws Ensure the lock mechanism closes correctly If not r...

Page 13: ...4 Parts needed No 40 QTY 35 Place the first floor board No 40 inside the building flush to the log board on the wall Continue adding the floor boards internally making sure to interlock each individua...

Page 14: ...0mm Screws IMPORTANT Pre drill before fixing screws 23 23 42 42 30mm screw Pre drill hole Cut to fit Step 26 Parts needed No 42 QTY 6 Once the floor has been laid arrange the closure trim No 42 around...

Page 15: ...rrange the storm braces No 41 around the building internally Placing two storm braces per side fixing into place using 2x 70mm bolts per brace making sure the washer nut are tightened from the outside...

Page 16: ...n Guards No 6 to the Window frame fixing in place onto the framing above the window using 3x70mm screws per guard Attach the Rain Guard No 16 to the Door frame fixing in place onto the framing above t...

Reviews: