background image

!

24/7 Support

help.backyardproducts.com

Business Hours

(734) 242-6900

Answers to frequently 

asked questions

Monday - Friday ........... 8:00am - 6:00pm EST

Saturday - Sunday .................................Closed

Technical assistance and 

how-to videos
Submit a help request
Request replacement parts

Did you enjoy building your shed? 

JOIN OUR TEAM

AND MAKE UP TO $1,500/WEEK*

o

r

 

vis

i

t b

a

cky

ard

in

st

a

l

l

er.

co

m

Flexible schedule 

No selling,

just building

Bonus incentives 

available

S

ca

n

 th

f

 owc

o

de 

t

a

p

ply 

to

d

a

y

.

INSTALLERS

WANTED

*based on number of completed installations

Call a Recruiter Today!  734-365-7000

STOP

DO NOT RETURN

   

TO THE STORE!

If you discover missing or damaged parts,

or if you have questions about the building process,

please reach out to us directly for the fastest service.

16835-W

Summary of Contents for 16835-W

Page 1: ...hed JOIN OUR TEAM AND MAKE UP TO 1 500 WEEK o r v i sit backyardinstaller c o m Flexible schedule No selling just building Bonus incentives available S c a n t he f lowcode to apply t o d a y INSTALLE...

Page 2: ...This page intentionally left blank...

Page 3: ...10 CHECK ALL PARTS Inventory all parts listed on pages 5 8 ADDITIONAL MATERIALS You will need additional materials to complete your shed See pages 3 4 for required and optional materials and quantitie...

Page 4: ...on Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible...

Page 5: ...use you may want to construct a heavy duty floor frame by adding additional floor joists shown below as shaded Below is a list of additional materials not included x3 x4 x12 x16 2 x 4 x 10 5 1 x 10 2...

Page 6: ...terior caulk that is paintable 7 3 4 9 3 5 10x12 10x16 10x12 10x16 2 coats recommended DRIP EDGE Feet 15 ROOFING FELT Sq ft to cover 1 GALVANIZED ROOFING NAILS lbs 60 146 70 255 For roofing felt 2 5 1...

Page 7: ...16 1 x 20 x 186 2 cm x4 3 8 x 5 7 8 x 72 3 4 1 x 14 9 x 184 8 cm x2 3 8 x 4 3 4 x 75 7 8 1 x 12 1 x 197 2 cm x2 3 8 x 4 3 4 x 75 7 8 1 x 12 1 x 197 2 cm x4 3 8 x 4 3 4 x 80 5 8 1 x 12 1 x 204 8 cm x1...

Page 8: ...1 x 21 9 x 121 9 cm x4 7 16 x 8 5 8 x 27 1 4 1 1 x 21 9 x 69 2 cm x4 7 16 x 48 x 96 1 1 x 121 9 x 243 8 cm x2 7 16 x 47 7 8 x 48 1 1 x 121 6 x 121 9 cm x2 WALL PANEL DOORS PARTS LIST 3 8 x 48 x 84 1 x...

Page 9: ...used where screws are shown for quicker assembly Length of nail must match screw length VENT WINDOW and DOOR HARDWARE x2 Transom Window 3 4 1 9 cm x8 x1 64 Metal Threshold 3 4 1 9 cm x11 Bagged sepera...

Page 10: ...panels are 7 16 1 1 cm thick WOOD SIZE CONVERSION CHART Nominal Board Size Actual Size 1 x 4 3 4 x 3 1 2 1 9 x 8 9 cm 2 x 4 1 1 2 x 3 1 2 3 8 x 8 9 cm 2 x 3 1 1 2 x 2 1 2 3 8 x 6 3 cm 1 x 3 3 4 x 2 1...

Page 11: ...approved concrete anchors fasteners not included Check local code for concrete foundation requirements 120 304 8 cm 120 304 8 cm 137 348 cm 185 469 9 cm 10 x 12 304 8 x 365 8 cm 10 x 16 304 8 x 487 7...

Page 12: ...h ground For best results and aiding in water drainage use gravel under each concrete block LEVELING METHODS MATERIAL REQUIRED 4 x 4 x 12 10 2 x 10 2 x 305 cm Treated Lumber 4 x 4 x 16 10 2 x 10 2 x 4...

Page 13: ...m First secure at ends with one fastener Fig B Fig B 187 7 16 476 1 cm 226 7 16 575 2 cm 187 7 16 476 1 cm 226 7 16 575 2 cm LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking it is important...

Page 14: ...necessary The floor should used as a stable work surface for wall construction Organize your assembly procedure during the build process to avoid over handling of the walls HINT EAVE WALL EAVE WALL Yo...

Page 15: ...g the floor and 2 CLA parts 120 3 4 306 7 cm CLA x2 Secure 1 CLA flush to the floor deck with 2 3 screws Fig A Measure over 120 3 4 306 7 cm and install a second CLA flush to the floor deck Secure wit...

Page 16: ...hold the measurements when you nail on gussets Secure the gusset to the rafters with 10 2 nails in the pattern shown Fig A Press ECN firmly against the outside of CLA s as shown Fig A and push rafters...

Page 17: ...ge 20 Wall 06 Page 28 Build 2 eave walls 10 x 12 Wall 02 Page 20 Wall 03 Page 22 Wall 04 Page 24 Wall 05 Page 26 10 x 16 Wall 02 Page 20 Wall 03 Page 22 Wall 06 Page 28 Wall 07 Page 30 WALL INDEX 10 x...

Page 18: ...on flat surface flush in middle Center OSB on top of AM Fasten together with 3 nails in the pattern shown Your door header is now assembled FINISH OSB ASSEMBLED END VIEW BEGIN 1 AM AM 2 Flip header a...

Page 19: ...ame Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with 2 2 nails Fig B 3 4 Gauge Bloc...

Page 20: ...x 68 5 1 x 10 2 x 172 7 cm YFA x6 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI x2 2 x 4 x 84 5 1 x 10 2 x 213 4 cm TO 2 x 4 x 36 5 1 x 10 2 x 91 4 cm x2 SL TO YFA YFA TO SL SL AI x6 UY x3 Flush Flush Flus...

Page 21: ...REQUIRED 10 WALL 01 2 5 1 cm x158 x1 x1 6 15 2 cm 1 1 2 3 8 cm BEGIN HERE 3 4 1 9 cm Flush Flush OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw 3 4 1 9 cm x1 69 75 3 cm D...

Page 22: ...x2 x28 2 x 4 x 24 5 1 x 10 2 x 61 cm RL 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP 24 61 cm 96 234 8 cm RL TP TP RL AI x6 1 BEGIN Arrange parts on edge on floor as sh...

Page 23: ...stall 48 x 84 panel 1 1 2 from the top plate Use a 2x4 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel 2 Install the 48 x 84 and 2 23 7 8 x 84 p...

Page 24: ...PARTS REQUIRED x32 x7 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI TO SL TO SL AI x7 1 BEGIN Orient parts on edge on floor as shown Measure and mark from end of boards Secure with 2 3 nails at each connec...

Page 25: ...lip the wall over FINISH Install 48 x 84 panel 1 1 2 from the top plate Use a 2x4 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel 2 Install the...

Page 26: ...YFA HVC TJ AI x5 1 BEGIN Orient parts on edge on floor Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 12 WALL 04 3 7 6 cm x24 x1 2 x 4 x 92 5 8 5...

Page 27: ...anel 1 1 2 from the top plate Use a 2x4 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel 2 Install 2 48 x 84 panels flush to installed panels Loc...

Page 28: ...2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI HVC YFA YFA YFA YFA TJ AI x5 UY x3 Seam Seam 3 7 6 cm Screws x1 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC x1 2 x 4 x 92 5 8 5 1 x 10 2 x 235 3 cm TJ Arrange part...

Page 29: ...78 1 2 5 1 x 10 2 x 199 4 cm AI HVC YFA YFA YFA YFA TJ AI x4 UY x3 Seam Seam 3 7 6 cm Screws x1 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC x1 2 x 4 x 92 5 8 5 1 x 10 2 x 235 3 cm TJ Arrange parts on edg...

Page 30: ...t panel flush to installed panel as shown Ensure 64 162 8 cm door measurement Secure panel with 2 nails spaced 6 apart on edges 2x4 6 15 2 cm Flush Flush 4 3 64 162 6 cm Install 48 x 84 panel flush to...

Page 31: ...rient parts on edge on floor Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 16 WALL 06 3 7 6 cm x36 PARTS REQUIRED AI x7 YFA HVC SP SP YFA TJ Seam...

Page 32: ...p the wall over FINISH Install 48 x 84 panel 1 1 2 from the top plate Use a 2x4 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel 2 Install 3 48 x...

Page 33: ...4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI HVC TJ YFA YFA YFA YFA SP SP AI x6 UY x3 Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Heade...

Page 34: ...panel as shown Ensure 64 162 8 cm door measurement Use part OO as a temporary brace Secure with with 2 3 screws Secure panel with 2 nails spaced 6 apart on edges 2x4 6 15 2 cm Flush Flush OO Temporary...

Page 35: ...TED ON 12 EAVE WALL STANDARD DOOR LOCATED ON 10 GABLE WALL The following steps show how to stand and secure your walls for a 10 x 12 shed These instructions are by default with the door on the 10 gabl...

Page 36: ...cm overlap is to the top OO BEGIN 1 1 2 3 8 cm 3 7 6 cm Screws Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates to fl...

Page 37: ...nto floor frame Fig C Nail panel to 10 wall stud with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your 12 wall is now installed FINISH 2 5 1 cm x27 1 1 2 3 8 cm x13 2 5 1 cm x2 PARTS REQ...

Page 38: ...6 apart Angle nails into floor frame Fig C Secure wall bottom plates to floor with 3 nails Fig C 1 1 2 3 8 cm Nails 6 15 2 cm 3 7 6 cm Screw Fig D 6 15 2 cm Secure wall with 1 2 screw through gable w...

Page 39: ...1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH CUT OUT AND REMOVE BOTTOM PLATE AT DOOR OPENING 2 5 1 cm x10 1 1 2 3 8 cm x26 2 5 1 cm x4 PARTS REQUIRED S...

Page 40: ...from top with 2 3 nails spaced every 24 Fig A Your wall doublers are now installed FINISH Fig A x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP x2 2 x 4 x 48 5 1 x 10...

Page 41: ...cm overlap is to the top OO BEGIN 1 1 1 2 3 8 cm 3 7 6 cm Screws Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates to...

Page 42: ...nto floor frame Fig C Nail panel to 10 wall stud with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your 16 wall is now installed FINISH 2 5 1 cm x36 1 1 2 3 8 cm x13 2 5 1 cm x2 PARTS REQ...

Page 43: ...SURE PANEL CORNERS ARE FLUSH BEGIN 1 2 2 5 1 cm x2 Flush 2 5 1 cm Screw Fig B 2 5 1 cm Screw Fig A Remove temporary brace OO from installed 10 wall Place 16 wall centered on floor 1 1 2 3 8 cm overlap...

Page 44: ...d 6 apart Your 2nd 16 wall is now installed FINISH 3 7 6 cm Nails 1 1 2 3 8 cm x13 Secure gable wall top plate with 1 3 screw at the corner at an angle as shown Fig D 5 3 Nail lower edge of wall panel...

Page 45: ...s with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH CUT OUT AND REMOVE BOTTOM PLATE AT DOOR OPENING REMOVE TEMPORARY BRACING 2 5 1 cm x10 1 1 2 3 8 cm...

Page 46: ...24 Fig A Your wall doublers are now installed FINISH x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP x4 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP DOOR Ensure all doubler sea...

Page 47: ...ve the measurements shown Secure rafters with 2 3 screws angled at each end Fig A Fig B Secure rafters on opposite side 1 FINISH Your rafters are now installed BEGIN Rafter with ONE GUSSET facing inwa...

Page 48: ...Place left and right panels on UV flush to middle panel Secure panel with 1 1 2 nails spaced 6 apart along edge Repeat steps to assemble the 2nd gable unit Install gable panels with the primed side f...

Page 49: ...semblies Fig B x8 2 x 3 x 75 1 4 5 1 x 7 6 x 191 1 cm ECA x12 2 x 4 x 4 7 8 5 1 x 10 2 x 12 4 cm CLA 3 7 6 cm x56 Fig B x4 Fig A Flush Flush Flush Flush Flush 3 7 6 cm Screws Flip over the gable ladde...

Page 50: ...wn Fig E 8 7 Arrange gable and ladder assemblies as shown Fig E You will build 2 complete assemblies Fig E Flush Flush Flush Repeat steps 7 and 8 to build the 2nd gable unit FINISH You have finished b...

Page 51: ...S REQUIRED GABLE UNITS 3 7 6 cm x8 x2 Gable Units 2 5 1 cm x46 2 3 1 BEGIN Continue nailing lower edge of panels to wall doubler with 2 nails spaced 6 apart Working inside secure gable unit with 2 3 s...

Page 52: ...nits are now installed Repeat all steps to install the 2nd gable unit PARTS REQUIRED GABLE UNITS 3 7 6 cm x24 5 Secure gable unit frame to end rafter with 3 screws evenly spaced Angle screws if necces...

Page 53: ...ide painted grid lines facing up Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until the bottom corner is flush to rafter end Fig B Move the gable un...

Page 54: ...he edge panel Fig C Secure panel with 2 2 nails in the corners Install 1 27 1 4 x 48 panel flush to installed panel and the panel flush to rafter ends Fig B Secure panel with 2 2 nails in the corners...

Page 55: ...with 1 2 nail in each corner 6 Flush Flush Flush Flush Flush 27 1 4 x 48 27 1 4 x 48 47 7 8 x 48 Move Gable 3 8 1 0 cm Gable End Rafter Fig C 2 5 1 cm Nails 7 Maintain spacing between the centers of t...

Page 56: ...h to lower ends of gable frame and rafter and flush to outside edge of gable frame Secure with 1 2 nail in each corner Secure all panels with 2 nails spaced 6 apart along panel edges and 12 apart insi...

Page 57: ...ide painted grid lines facing up Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until the bottom corner is flush to rafter end Fig B Move the gable un...

Page 58: ...ails in the corners Move Gable Move Rafter Two Nails 3 8 1 0 cm Fig C Flush Flush Flush 2 5 1 cm Nails 6 5 Fig D Maintain spacing between the centers of the rafters and to the outside of the gable fra...

Page 59: ...3 8 1 0 cm Gable End Rafter Fig C 3 8 1 0 cm Gable End Rafter Fig C 2 5 1 cm Nails 9 Maintain spacing between the centers of the rafters Fig D If necessary move the gable until the end rafter s edge i...

Page 60: ...to lower ends of gable frame and rafter and flush to outside edge of gable frame Secure with 1 2 nail in each corner Secure all panels with 2 nails spaced 6 apart along panel edges and 12 apart insid...

Page 61: ...le panel and flush to gable end Secure with 2 finishing nails spaced evenly Repeat steps to install soffit boards on opposite side x4 3 8 x 7 7 8 x 73 5 16 1 x 20 x 186 2 cm x72 2 5 1 cm 2 1 BEGIN You...

Page 62: ...fter and 4 at seam Angle nails at seam Fig C x4 3 8 x 5 7 8 x 72 3 4 1 x 14 9 x 184 8 cm x32 2 5 1 cm 1 BEGIN You have finished installing your eave soffit panels FINISH Repeat steps to install eave s...

Page 63: ...d panel Fig A Secure with 2 finishing nails 2 in each rafter Fig B Angle nails at seams Fig C x4 3 8 x 5 7 8 x 72 3 4 1 x 14 9 x 184 8 cm x44 2 5 1 cm 1 BEGIN You have finished installing your eave so...

Page 64: ...posite side Your gable fascia boards are now installed FINISH 1 BEGIN PARTS REQUIRED x2 3 8 x 4 3 4 x 75 7 8 1 x 12 1 x 192 7 cm x2 3 8 x 4 3 4 x 75 7 8 1 x 12 1 x 192 7 cm Fig A Fig B Flush Flush at...

Page 65: ...nails 2 in each rafter and 4 nails at seam Fig B Angle nails at seam Repeat steps to install fascia on opposite eave Your eave side fascia boards are now installed FINISH 1 BEGIN PARTS REQUIRED x4 3 8...

Page 66: ...1 5 8 4 1 cm 2 3 Attach temporary support OO with 3 screws in middle and at ends as shown Attach temporary support GAA with 2 1 5 8 screws OO GAA OFFSET 4 3 7 6 cm Screws 2 1 1 4 3 cm Screws Bottom ed...

Page 67: ...doors Screw hinge boards into wall supports and floor with 10 3 screws as shown Make sure screws go into framing and floor Fig C D 6 3 7 6 cm Screws into the wall support and floor frame Fig B SEAM F...

Page 68: ...6 cm Center metal threshold between doors secure using eleven 3 4 special coating screws Fig C 5 Your door and trim are now secured FINISH BEGIN 1 2 Secure two horizontal door rails AH with 4 3 4 scre...

Page 69: ...inside edge of door Mark center of window opening on door Position window in opening flush to bottom of window opening Center window on mark Secure with 4 screws to secure each window 2 Apply high qua...

Page 70: ...dge of door Fig A 1 PARTS REQUIRED x14 2 5 1 cm DOOR STIFFENERS FINISH Repeat steps to install OO on right door Secure with 7 2 screws through outside trim into OO Fig B 2 Fig A Center OO in door open...

Page 71: ...side of right door as shown Fig A Pre drill hole with 1 4 drill 1 3 4 4 4 cm 1 4 Pre drill and 1 2 Drill through Fig A 1 2 13 mm Drill Bit 1 4 6 mm Drill Bit Your door is now prepared for handle insta...

Page 72: ...70 DOOR HARDWARE PARTS REQUIRED 1 2 13 mm Drill Bit 1 4 6 mm Drill Bit x1 1 1 4 x2 Handle locking with Screws RIGHT DOOR Set Screw 1 1 4 Wood Screws Secure handle with 1 1 4 screws as shown...

Page 73: ...drill bit 2 BEGIN 1 LEFT DOOR Fig B Your spring bolts are now installed Fig A Flush Flush 69 175 3 cm Door Stiffener 69 175 3 cm Door Stiffener 3 8 drill for bolt 1 1 2 deep 3 8 drill for bolt 1 1 2 d...

Page 74: ...1 2 82 1 2 82 1 2 81 7 8 NOTE 10 x 12 Model Shown Seam is flush Caulk seam before painting trim Flush to eave soffit Fig B Fig C Install gable end 82 1 2 corner trim flush to gable panel Fig A and fl...

Page 75: ...wall and then on every other rafter as shown FINISH Your collar ties are now installed 1 BEGIN 2nd 2nd 4th 4th HINT For best appearance install collar ties on back side of rafter Fig A PARTS REQUIRED...

Page 76: ...r vents are now installed GABLE VENTS Repeat to install 2nd vent in the opposite gable x8 8 x 1 2 5 cm Pan Head Screws 8 x 1 2 5 cm Pan Head Screws Locate vent in the gable wall as shown Seal vent fro...

Page 77: ...Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED...

Page 78: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Page 79: ...oof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first ro...

Page 80: ...ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Page 81: ...ut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm 2 5 cm 2 5 cm Top of slot Weather Seal Flush 1 Nail per...

Page 82: ...4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge...

Page 83: ...3 4 X 80 5 8 K 80100412000 4 Gable Trim RIGHT 3 8 NG 4 3 4 X 75 7 8 26 5 K 75140412100 2 Gable Trim LEFT 3 8 NG 4 3 4 X 75 7 8 26 5 K 75140412200 2 Corner Trim Eave Side 3 8 NGx1 3 4 x 81 7 8 TRIM K...

Page 84: ...B siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit Thi...