![background image](http://html1.mh-extra.com/html/backyard-products/16835-w/16835-w_assembly-manual_3343292061.webp)
59
PARTS REQUIRED:
GABLE SOFFIT PANELS
Position right
73-5/16"
soffit panel flush to gable panel and flush to gable end.
Secure with 2" finishing nails spaced evenly.
Position left
73-5/16"
soffit panel flush to gable panel and flush to gable end.
Secure with 2" finishing nails spaced evenly.
Repeat steps to install soffit boards on opposite side.
x4
3/8 x 7-7/8 x 73-5/16" (1 x 20 x 186,2 cm)
x72
2" (5,1 cm)
2
1
BEGIN
You have finished installing your soffit panels.
FINISH
Flush to gable panel.
Flush to gable panel.
8"
(20,3 cm)
8"
(20,3 cm)
2" (5,1 cm)
Finishing Nails
Flush
Flush
Install all soffit panels with the primed side facing out.