39
Flush
3" (7,6 cm)
x2
PARTS REQUIRED:
10' WALL 02 INSTALLATION
3" (7,6 cm)
x10
2" (5,1 cm)
x23
OO
x1
69" (175,3 cm) Door Stiffener
3"
(7,6 cm)
Nails
Center 10' wall on the 120"
(304,8 cm) floor dimension.
1-1/2" (3,8 cm) overlap is to the top.
OO
BEGIN
1
1-1/2"
(3,8 cm)
3"
(7,6 cm)
Screws
Secure lower edge of panel to floor
frame with 2" nails spaced 6" apart.
Angle nails into floor frame
(Fig. A)
.
Secure wall bottom plates to floor
with 3" nails
(Fig. A)
.
2
Your 10' wall is now standing.
FINISH
Use
OO
as a temporary brace.
Secure with (2) 3" screws.
6"
(15,2 cm)
DOOR
DOOR
Nail 2" nails first.
2" (
5,1 cm)
Nails
3"
(7,6 cm)
Nails
Fig. A