P 8
Please retain product label and instructions for future reference
30mm
screw
Pre drill
hole
14
17
16
18
IMPORTANT:
Pre-drill before fixing screws.
Step 8
Parts Needed - No. 14 QTY 5
No. 16 QTY 6
No. 17 QTY 6
No. 18 QTY 6
Following the method shown in
the illustration, lay the first 6
boards (
No. 14, 16, 17 & 18
) off of
the starter boards to create your
first level, ensuring that the back
log boards
(No.16)
sit inside the ‘U’
channel.
*Ensure that the boards are level
and flush with each other as you
lay each one.
Secure the front top board
(No.18)
by screwing straight through the
log board into the log board of the
cabin behind using 2x30mm
screws, as shown in the illustration.
Secure the back top board
(No.16)
by screwing through the Log board
at an angle into the ‘U’ channel,
using 2x30mm screws.
4x30mm screws.
18
16
IMPORTANT :
Pre-drill before fixing screws.
5
3
2
5
3
Step 9
Parts Needed - No. 2 QTY 1
No. 3 QTY 1
No. 4 QTY 1
No. 5 QTY 1
Arrange the left, right, top & bottom door
frames (
No’s. 2, 3, 4, & 5
) onto a firm and level
surface. Secure the top and bottom frames to
the uprights using 2x80mm screw per corner,
ensuring the screws do
NOT
protrude through
the front of the door framing.
8x80mm Screws
Pre drill
hole
80mm
screw
The internal lip of the door
frame should be postioned on
the inside of the building.
4