P 16
Please retain product label and instructions for future reference
40mm
screw
Pre drill
hole
Step 26
Parts Needed - No. 26 QTY 2
Attach the fascia’s (
No. 26
), including the
remaining fascias from the Log cabin, around
the building (
ensuring to trap the felt in
between the fascia’s
) securing into place
using 3x40mm screws per fascia.
Ensure the fascia at the back of the log
cabin sits level or lower than the felt to
allow water to run off.
*Once in place mark the excess fascia with a
pencil and trim the fascias to follow the
shape of building as shown in the
illustration.
21x40mm Screws
IMPORTANT:
Pre-drill before fixing screws.
26
Pre drill
hole
60mm
bolt
33
33
Step 27
Parts needed - No. 33 QTY 4
Arrange the storm braces
(No.33)
around the building (
internally
),
Placing 2xStorm braces per side, fixing
into place using 2x 60mm bolts per
brace ,making sure the washer & nut
are tightened from the outside of the
building.
*Ensure the storm braces are secured
at the highest point possible on each
side.
The storm braces will need to be
altered during the buildings life as the
moisture content within the log boards
changes. The boards will expand
during periods of high moisture
(Winter) and shrink during periods of
low moisture (Summer.)
**Storm braces will help your building
expand and contract properly.
***Important: Ensure each bolt is
tightened using a washer so as not to
damage the log boards.
8x60mm Bolt Sets