Mercia Garden Products 0619LOG015-V4 Assembly Instructions Manual Download Page 11

It is ESSENTIAL that you apply wood treat

-

ment immediately after the building has 

been assembled.

Please retain product label and instructions for future reference

             

Pre drill 

hole

60mm 

bolt

Step 19

Parts needed - No. 21 QTY 8

Arrange the storm braces (No. 21)

around the building (internally ). 

Place 2x storm braces per side 

fixing into place using 2x 60mm 

bolts per brace making sure the 

washer & nut are tightened from 

the outside of the building.

*Ensure the storm braces are

secured at the highest point

possible on each side.

**Storm braces will help your

building expand and contract

properly.

***Important: Ensure each

bolt is tightened using a 

washer so as not to damage 

the log boards.

16x60mm Bolt Sets

P 11

21

21

Summary of Contents for 0619LOG015-V4

Page 1: ...sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be const...

Page 2: ...rd 50x19x4000mm QTY 2 LB19RG50 A 4000 Log Board 120x19x2996mm QTY 25 LB19 A 2996 Log Board 120x19x1123mm QTY 24 LB19 B 1123 Roof Purlin 40x90x4004mm QTY 3 F4090 4004 Bearer 44x44x3720mm QTY 10 F4444 3...

Page 3: ...PI 07 0208 20x100x2mm 25 Felt Tacks x400 70mm Screw x64 Nail Bag 40mm Screw x524 30mm Screw x84 60mm Bolt Set x16 Pre assembly Please note Each board interlocks at either end in a staggered pattern Be...

Page 4: ...14 14 14 14 14 14 14 IMPORTANT Pre drill before fixing screws Pre drill hole 70mm screw a Step 1 Parts Needed No 14 QTY 10 No 15 QTY 2 Lay the bearers No s 14 15 onto a firm and level surface free fro...

Page 5: ...r second level Ensure that the boards are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame by 12 13 boards refer to door installation...

Page 6: ...are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame Step 8 Parts Needed No 8 QTY 1 No 10 QTY 1 No 22 QTY 1 No 23 QTY 1 Following th...

Page 7: ...rts needed No 13 QTY 3 Align the Roof Purlin s No 13 into the cut out slots on each gable top ensuring each roof purlin interlocks the boards Secure the roof purlins at each end by screwing through th...

Page 8: ...op of the apex The last board on each side will overhang Using a straight edge and a pencil mark out a line as a guide Cut along the pencil mark and remove the excess Place the cut down boards back on...

Page 9: ...gh each of the floor boards into the floor bearers 272x40mm Screws 40mm screw Pre drill hole Cut to fit Closure Trim Internal 23 Measure and cut the closure trims to fit the internal space 23 23 Closu...

Page 10: ...ging felt each side Once the felt is laid out fix to the roof using felt tacks at 100mm intervals Felt size 4124mm 252x Felt Tacks 1 2 3 4 5 Step 18 Parts Needed No 16 QTY 4 No 17 QTY 2 Align the fasc...

Page 11: ...1 around the building internally Place 2x storm braces per side fixing into place using 2x 60mm bolts per brace making sure the washer nut are tightened from the outside of the building Ensure the sto...

Reviews: