background image

P 3

Please retain product label and instructions for future reference

             

Pre Assembly

Before assembling remove the transportation

blocks from the bottom of each panel.

Take care removing the blocks as to not damage

the panels. Tap with a flat headed screwdriver 

and hammer.

Dispose of the blocks once removed.

Parts Needed - No. 1 Qty 1

 

 

   No. 4 Qty 2

 

 

   No. 14 Qty 4

Place the door gable 

(No. 1)

 on to a flat 

surface and place both doors

 (No. 4) 

into the door apeture. 

Locate the four t hinges 

(No. 14) 

onto 

the doors and door gable ensuring they 

sit over the door framing. Fix the hinges 

to the door and door gable using 

7x30mm screws per hinge.

28 x 30mm Screws

Step 1

1

4

14

30mm 

screw

Pre drill 

hole

IMPORTANT: 

Pre-drill before fixing screws.

Parts Needed - No. 6 Qty 2

Place the floors 

(No. 6)

 on a firm and 

level base, ensure the base has suitable 

drainage, free from areas where water 

can collect (see front page for base 

requirements).

Position the floors side by side as 

shown in the diagram. Fix together 

using 4 x 50mm screws alternating the 

fixing poisiton along the length of the 

floor.

4 x 50mm Screws

Step 2

Pre drill 

hole

50mm 

screw

6

6

IMPORTANT: 

Pre-drill before fixing screws.

Do not secure the building 

to the floor until the roof is 

fitted.

Fix the corner with 3x 

50mm screw a shown in 

diagram.

Step 3

IMPORTANT: 

Pre-drill before fixing screws.

Parts Needed - No. 2 Qty 1

 

 

   No. 3 Qty 1

3 x 50mm Screws

3

2

Pre drill 

hole

50mm 

screw

Summary of Contents for 05DTOVAX0307DD-V1

Page 1: ...moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered...

Page 2: ...over Trim 7 x 45 x 1324mm Qty 4 S745 1324MM 10 Eaves Frame 28 x 28 x 825mm Qty 2 F2828 825MM 11 Ridge Bar 28 x 28 x 744mm Qty 1 F2828 744M 9 Door Trim 12 x 27 x 1261mm Qty 2 S1227 1261MM 2 3 1 Door Ga...

Page 3: ...mm screws per hinge 28 x 30mm Screws Step 1 1 4 14 30mm screw Pre drill hole IMPORTANT Pre drill before fixing screws Parts Needed No 6 Qty 2 Place the floors No 6 on a firm and level base ensure the...

Page 4: ...for each end Secure in place using 4 x 30mm screws per L Bracket 8 x 30mm Screws Pre drill hole 50mm screw 17 11 11 17 Step 6 IMPORTANT Pre drill before fixing screws Parts Needed No 5 Qty 2 No 10 Qt...

Page 5: ...ty 2 Attach the fascias No 7 to the front and back of the building ensuring to trap the felt between the gable and the fascia Use 3 x 30mm screws per fascia ensuring to fix through to the panel framin...

Page 6: ...he top and bottom of the door using a 30mm screw per turn button 2 x 30mm Screws 30mm screw Pre drill hole IMPORTANT Pre drill before fixing screws 16 16 16 Step 13 Parts Needed No 9 Qty 2 Locate the...

Page 7: ...P 7 Please retain product label and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled...

Page 8: ...2 1 3 4...

Page 9: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Reviews: