![Mercia Garden Products 05DTOVAX0307DD-V1 General Instructions Manual Download Page 4](http://html1.mh-extra.com/html/mercia-garden-products/05dtovax0307dd-v1/05dtovax0307dd-v1_general-instructions-manual_1772692004.webp)
P 4
Do not secure the building
to the floor until the roof is
fitted.
Fix the corner with 3x
50mm screw a shown in
diagram.
Step 4
IMPORTANT:
Pre-drill before fixing screws.
Parts Needed - No. 1 Qty 1
No. 2 Qty 1
9 x 50mm Screws
1
2
Pre drill
hole
50mm
screw
Step 5
IMPORTANT:
Pre-drill before fixing screws.
Parts Needed - No. 11 Qty 1
No. 17 Qty 2
Place the Ridge Bar
(No. 11)
in between
the door and plain gables. Ensure the
top corner of the ridge bar sit flush with
the top of the gables. Fix the ridge bar
to both gables usine one L Bracket
(No.
17)
for each end. Secure in place using
4 x 30mm screws per L Bracket.
8 x 30mm Screws
Pre drill
hole
50mm
screw
17
11
11
17
Step 6
IMPORTANT:
Pre-drill before fixing screws.
Parts Needed - No. 5 Qty 2
No. 10 Qty 2
Attach the Eaves Frame
(No. 10)
to the
roof sheets
(No. 5)
using 3 x 30mm
screws per eaves.
Secure the roof sheet into place using 8
x 30mm screws, ensure the roof sheet
sits square over the building and the
screws go through the sheet into the
panel framing below.
22 x 30mm Screws
Pre drill
hole
30mm
screw
5
10
Please retain product label and instructions for future reference
Step 7
IMPORTANT:
Pre-drill before fixing screws.
12 x 50mm Screws
Pre drill
hole
50mm
screw
Secure the building to the
floor internally using 12 x
50mm screws.
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk