background image

P 6

Please retain product label and instructions for future reference

             

Please retain product label and instructions for future reference

             

Step 11

Parts Needed - No. 12 Qty 2

Attach the bolt blocks 

(No. 12)

 to the 

doors using 2 x 30mm screws, in the 

positions illustrated. Screw through the 

door cladding into the blocks using 

30mm screws.

4 x 30mm Screws

30mm 

screw

Pre drill 

hole

IMPORTANT: 

Pre-drill before fixing screws.

12

12

Step 12

Parts Needed - No. 16 Qty 4

Fix the turn buttons 

(No. 16)

 to the bolt 

blocks at the top and bottom of the 

door using a 30mm screw per turn 

button.

2 x 30mm Screws

30mm 

screw

Pre drill 

hole

IMPORTANT: 

Pre-drill before fixing screws.

16

16

16

Step 13

Parts Needed - No. 9 Qty 2

Locate the Door Strips 

(No.9)

 onto the 

door gable and fix into place using 

3x30mm screws. ensure that the screw 

is parallel withthe door frame when 

fixing, as shown in the close up view.

6 x 30mm Screws

30mm 

screw

Pre drill 

hole

IMPORTANT: 

Pre-drill before fixing screws.

9

9

9

Step 14

Parts Needed - No. 15 Qty 4

 

Screw the Staple 

(No.15) 

to the left 

Door, make sure the Hasp 

(No.15)

 is in 

line with the staple and screw into the 

right Door.

7x 30mm Screws

30mm 

screw

Pre drill 

hole

IMPORTANT: 

Pre-drill before fixing screws.

15

Summary of Contents for 05DTOVAX0307DD-V1

Page 1: ...moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered...

Page 2: ...over Trim 7 x 45 x 1324mm Qty 4 S745 1324MM 10 Eaves Frame 28 x 28 x 825mm Qty 2 F2828 825MM 11 Ridge Bar 28 x 28 x 744mm Qty 1 F2828 744M 9 Door Trim 12 x 27 x 1261mm Qty 2 S1227 1261MM 2 3 1 Door Ga...

Page 3: ...mm screws per hinge 28 x 30mm Screws Step 1 1 4 14 30mm screw Pre drill hole IMPORTANT Pre drill before fixing screws Parts Needed No 6 Qty 2 Place the floors No 6 on a firm and level base ensure the...

Page 4: ...for each end Secure in place using 4 x 30mm screws per L Bracket 8 x 30mm Screws Pre drill hole 50mm screw 17 11 11 17 Step 6 IMPORTANT Pre drill before fixing screws Parts Needed No 5 Qty 2 No 10 Qt...

Page 5: ...ty 2 Attach the fascias No 7 to the front and back of the building ensuring to trap the felt between the gable and the fascia Use 3 x 30mm screws per fascia ensuring to fix through to the panel framin...

Page 6: ...he top and bottom of the door using a 30mm screw per turn button 2 x 30mm Screws 30mm screw Pre drill hole IMPORTANT Pre drill before fixing screws 16 16 16 Step 13 Parts Needed No 9 Qty 2 Locate the...

Page 7: ...P 7 Please retain product label and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled...

Page 8: ...2 1 3 4...

Page 9: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Reviews: