1
Pre Assembly
Remove the transportation blocks from the bottom
of each panel before assembling the building.
P 3
Please retain product label and instructions for future reference
14
14
15
15
2
2
3
Step 1
Lay the Base framing
(No. 14
&
No. 15)
down on a flat level base and secure
together as shown with 60mm screws.
4x60mm screws.
Pre drill
hole
60mm
screw
Step 2
Position the Left Side Panel
(No. 1)
next
to the Back panel
(No. 2)
as shown and
secure with 3x40mm screws.
*Do
NOT
secure to the base framing until
the Roof is fitted.
3x40mm screws.
Pre drill
hole
40mm
screw
Step 3
Fix the second Back panel
(No. 2)
side by
side to the existing Back panel as shown
with 3x40mm screws.
Position the Right Side Panel
(No. 3)
to
next to the Back panel
(No. 2)
as
previously shown and secure with
3x40mm screws.
*Do
NOT
secure to the base framing until
the Roof is fitted.
6x40mm screws.
Pre drill
hole
40mm
screw