background image

P 14

Please retain product label and instructions for future reference

             

Step 10

16x50mm Screws

Once the roof is fixed attach 
the building to the floor with 
50 mm screws ensuring that 
the screws go through to the 
floor bearers.

b

Pre drill 

hole

50mm 

screw

Step 11

Place the Veranda floor central 
to the front of the building 
and fix in place with 50mm 
screws.

Pre drill 

hole

50mm 

screw

6

4x50mm Screws

Step 12

Secure the Veranda rails to the 
outside edge of the veranda 
floor and to the building. Fix 
the Veranda support to the 
front of the veranda and the 
roof.

Pre drill 

hole

50mm 

screw

14x50mm Screws

10

13

13

10

Fit the Cover Trims to the left 
and right hand side of the 
building as shown in the 
illustration using 30mm 
screws. Trim the length of the 
cover trims to the required 
size before fitting if necessary. 
Pre drill to avoid splitting. 

Step 13

12x30mm Screws

18

18

18

18

Summary of Contents for 03WES1008-V1

Page 1: ...s of assembly and thereafter in accordance with the manufactures recommenda tions Care must be taken to ensure the product is placed on a suitable base BUILDING A BASE When thinking about where the bu...

Page 2: ...upport 27x44x1685mm Qty 2 Fascia 12x95x1549mm Qty 4 Door Strip 12x60x800mm Qty 2 Window Strip 12x45x1055mm Qty 1 Tower Bolt Strip 19x45x140mm Qty 2 Cover Trims 12x30x1680mm Qty 4 Door Beading Strip 12...

Page 3: ...ure a flush fit Attach window beading with the 25mm glazing pins provided x4 pins per beading When nailing pins protect the glazing sheet with a piece of cardboard or similar to avoid breakage and scr...

Page 4: ...ace floor on firm and level base ensure base has suitable drainage free from areas where water can collect See front page on base requirements Place the two Floor Panels along side each other so that...

Page 5: ...ace the roof support on top of the roof support block and fix in place with the corner brace using 2x30mm screws at each end 21 22 33 Step 8 Connect two roof panels together using the u channel Lay tw...

Page 6: ...ce with 50mm screws Pre drill hole 50mm screw 6 4x50mm Screws Step 12 Secure the Veranda rails to the outside edge of the veranda floor and to the building Fix the Veranda support to the front of the...

Page 7: ...tacks as shown in diagram ensuring there is 50mm overhang around the sides 1 2 3 4 34 Step 15 16x40mm Screws Pre drill hole Fit the fascias to the roof over the felt and secure in place with 40mm scre...

Page 8: ...mm screws to fix the hinge to the Window Strip and 16mm screws to fix it to the Opening Window If you want to fix the opening windows instead of fixing hinges to the opening window use 4x30mm screws t...

Page 9: ...ws 30 30mm screw Pre drill hole Step 20 Attach the handle to the external side of the master door using 4x30mm black screws 4x30mm black screws 30mm screw Pre drill hole 32 Step 21 Attach a turn butto...

Reviews: