background image

P 11

Please retain product label and instructions for future reference

             

Remove transportation 
blocks from the bottom 
of each panel before 
beginning assembly. Each 
Panel should have two 

Pre Assembly 

Insert the glazing sheet into the window rebate, ensure a 

flush fit. Attach window beading with the 25mm glazing 

pins provided, x4 pins per beading. When nailing pins 

protect the glazing sheet with a piece of cardboard or 

similar to avoid breakage and scratches.

64x 25mm glazing pins

24

23

12

Step 1

Fix a Thinge to the top and bottom of each 

door and a hinge in the middle and fix to 

the door gable using 30mm black screws.

44 x 30mm black screws

26

26

26

26

26

27

27

27

8

9

Pre drill 

hole

30mm 

screw

1

Summary of Contents for 03WES1008-V1

Page 1: ...s of assembly and thereafter in accordance with the manufactures recommenda tions Care must be taken to ensure the product is placed on a suitable base BUILDING A BASE When thinking about where the bu...

Page 2: ...upport 27x44x1685mm Qty 2 Fascia 12x95x1549mm Qty 4 Door Strip 12x60x800mm Qty 2 Window Strip 12x45x1055mm Qty 1 Tower Bolt Strip 19x45x140mm Qty 2 Cover Trims 12x30x1680mm Qty 4 Door Beading Strip 12...

Page 3: ...ure a flush fit Attach window beading with the 25mm glazing pins provided x4 pins per beading When nailing pins protect the glazing sheet with a piece of cardboard or similar to avoid breakage and scr...

Page 4: ...ace floor on firm and level base ensure base has suitable drainage free from areas where water can collect See front page on base requirements Place the two Floor Panels along side each other so that...

Page 5: ...ace the roof support on top of the roof support block and fix in place with the corner brace using 2x30mm screws at each end 21 22 33 Step 8 Connect two roof panels together using the u channel Lay tw...

Page 6: ...ce with 50mm screws Pre drill hole 50mm screw 6 4x50mm Screws Step 12 Secure the Veranda rails to the outside edge of the veranda floor and to the building Fix the Veranda support to the front of the...

Page 7: ...tacks as shown in diagram ensuring there is 50mm overhang around the sides 1 2 3 4 34 Step 15 16x40mm Screws Pre drill hole Fit the fascias to the roof over the felt and secure in place with 40mm scre...

Page 8: ...mm screws to fix the hinge to the Window Strip and 16mm screws to fix it to the Opening Window If you want to fix the opening windows instead of fixing hinges to the opening window use 4x30mm screws t...

Page 9: ...ws 30 30mm screw Pre drill hole Step 20 Attach the handle to the external side of the master door using 4x30mm black screws 4x30mm black screws 30mm screw Pre drill hole 32 Step 21 Attach a turn butto...

Reviews: