background image

P 12

Please retain product label and instructions for future reference

             

Step 2

Fix the door beading 

strips to the door gable 

using 4x40mm screws 

for each strip.

Make sure to attatch the 

strips by screwing into 

the door gable through 

the strip.

12 x 30mm screws

20

19

19

Pre drill 

hole

30mm 

screw

Step 3

Fix the door strips to the 

master door using 

3x30mm screws per strip.

6 x 30mm screws

15

15

Pre drill 

hole

30mm 

screw

Step 4

5

5

Place floor on firm and level base, ensure base has 
suitable drainage free from areas where water can 
collect. (See front page on base requirements). 

Place the two Floor Panels along side each other so 
that the floor bearers sit flush. 
Then fix with 8x40mm Screws.

8x40mm Screws

Step 5

3 x 50mm Screws

2

3

Pre drill 

hole

50mm 

screw

Do not secure the building to the 
floor until the roof is fitted. Fix the 
panels onto the floor using 50mm 
screws in alignment with the floor 
joists

Fix the corners with 50mm screws 
as shown in diagram.

Position the panels so there is equal spacing 
between the floor and cladding on all 4 sides

3x50mm Screws

Summary of Contents for 03WES1008-V1

Page 1: ...s of assembly and thereafter in accordance with the manufactures recommenda tions Care must be taken to ensure the product is placed on a suitable base BUILDING A BASE When thinking about where the bu...

Page 2: ...upport 27x44x1685mm Qty 2 Fascia 12x95x1549mm Qty 4 Door Strip 12x60x800mm Qty 2 Window Strip 12x45x1055mm Qty 1 Tower Bolt Strip 19x45x140mm Qty 2 Cover Trims 12x30x1680mm Qty 4 Door Beading Strip 12...

Page 3: ...ure a flush fit Attach window beading with the 25mm glazing pins provided x4 pins per beading When nailing pins protect the glazing sheet with a piece of cardboard or similar to avoid breakage and scr...

Page 4: ...ace floor on firm and level base ensure base has suitable drainage free from areas where water can collect See front page on base requirements Place the two Floor Panels along side each other so that...

Page 5: ...ace the roof support on top of the roof support block and fix in place with the corner brace using 2x30mm screws at each end 21 22 33 Step 8 Connect two roof panels together using the u channel Lay tw...

Page 6: ...ce with 50mm screws Pre drill hole 50mm screw 6 4x50mm Screws Step 12 Secure the Veranda rails to the outside edge of the veranda floor and to the building Fix the Veranda support to the front of the...

Page 7: ...tacks as shown in diagram ensuring there is 50mm overhang around the sides 1 2 3 4 34 Step 15 16x40mm Screws Pre drill hole Fit the fascias to the roof over the felt and secure in place with 40mm scre...

Page 8: ...mm screws to fix the hinge to the Window Strip and 16mm screws to fix it to the Opening Window If you want to fix the opening windows instead of fixing hinges to the opening window use 4x30mm screws t...

Page 9: ...ws 30 30mm screw Pre drill hole Step 20 Attach the handle to the external side of the master door using 4x30mm black screws 4x30mm black screws 30mm screw Pre drill hole 32 Step 21 Attach a turn butto...

Reviews: