P 12
Please retain product label and instructions for future reference
Step 2
Fix the door beading
strips to the door gable
using 4x40mm screws
for each strip.
Make sure to attatch the
strips by screwing into
the door gable through
the strip.
12 x 30mm screws
20
19
19
Pre drill
hole
30mm
screw
Step 3
Fix the door strips to the
master door using
3x30mm screws per strip.
6 x 30mm screws
15
15
Pre drill
hole
30mm
screw
Step 4
5
5
Place floor on firm and level base, ensure base has
suitable drainage free from areas where water can
collect. (See front page on base requirements).
Place the two Floor Panels along side each other so
that the floor bearers sit flush.
Then fix with 8x40mm Screws.
8x40mm Screws
Step 5
3 x 50mm Screws
2
3
Pre drill
hole
50mm
screw
Do not secure the building to the
floor until the roof is fitted. Fix the
panels onto the floor using 50mm
screws in alignment with the floor
joists
Fix the corners with 50mm screws
as shown in diagram.
Position the panels so there is equal spacing
between the floor and cladding on all 4 sides
3x50mm Screws