P 7
Please retain product label and instructions for future reference
Please retain product label and instructions for future reference
Step 16
Screw through the side panel exter-
nally in line with the 2 x 1 framing
using 1 x 70mm screw in either side
to secure the framing in place.
Screw through the front panel
externally with 4 x 70mm screws
equally spaced a part along the door
frame to secure the 2 x 1 framing to
the panel.
*Please ensure you pre-drill prior to
screwing into the panel to eliminate
the chances of the timber splitting.
Drill 3 x 6mm holes into the
2 x 1 framing in line with your
barrell bolts. These will act as
the catch for the barrell bolts at
the top of your door.
* Ensure the holes are drilled in
to the 2 x 1 framing attached in
step 15 as oppose to the door
frame.
A
70mm
screw
Pre drill
hole
24
AFTER
Step 15
Place the Door support bar (No. 24)
to the inside of the door panel as
displayed on the pictures.
This framing will meet at each side
panel as show in image 2.
The 44mm side of the framing should
sit against the inside of the door
panel, matching the width of the
door frame timber.
*Ensure that the framing is attached
in a straight line matching the line of
the top of the door frame.
*Please be aware this piece of fram-
ing may need to be adjusted to
length by customer in regards of
building tolerances. This piece of
framing should fit tightly between
the two side panels.
Hand Saw
BEFORE