background image

P 4

Please retain product label and instructions for future reference

             

1

3

 

  

6

6

Step 4

Place the floor panels upside down

onto a firm and level base. Ensure

the base has suitable drainage, free

from areas where standing water

can collect.

Secure the floors together using

8x50mm screws through the floor

bearers in an alternating pattern.

Once fixed together turn the 

floor back the right way up.

8x50mm Screws

Pre drill 

hole

50mm 

screw

2

4

Step 5

 

Fix the corners with 50mm

 

screws as shown in the

 illustration.

 Do 

not

 secure the building

 

to the floor until the roof

 fitted.

3x50mm Screws

Pre drill 

hole

50mm 

screw

Step 6

 

Fix the corners with 50mm

 

screws as shown in the

 illustration.

 Do 

not

 secure the building

 

to the floor until the roof

 fitted.

9x50mm Screws

Pre drill 

hole

50mm 

screw

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

Summary of Contents for 03VER0808-V2

Page 1: ...ended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoi...

Page 2: ...h 2411mm Width 2484mm Height 2569mm Base Dimensions Length 2350mm Width 2360mm Please retain product label and instructions for future reference Before assembly please make sure you have a suitable ba...

Page 3: ...framing of the door panel using 3x butt hinges per door Fix to the door using 3x25mm screws 3x30mm screws to the framing per hinge ensure the doors open freely folding back into the building unrestri...

Page 4: ...the floor bearers in an alternating pattern Once fixed together turn the floor back the right way up 8x50mm Screws Pre drill hole 50mm screw 2 4 Step 5 Fix the corners with 50mm screws as shown in th...

Page 5: ...nterlock Secure in place using 4x50mm screws per gable top screwing in an alternating pattern 8x50mm Screws Pre drill hole 50mm screw 11 Pre drill hole 25mm screw 12 7 7 Step 9 Attach 2x eaves frames...

Page 6: ...f as shown in the illustration Ensure there is approximately 50mm overhang of felt around all sides of the building Fix into place using 110x felt tacks at 100mm intervals 110x Felt Tacks Felt tacks 1...

Page 7: ...bolts These will act as the catch for the barrell bolts at the top of your door Ensure the holes are drilled in to the 2 x 1 framing attached in step 15 as oppose to the door frame A 70mm screw Pre dr...

Page 8: ...indow cover that sealant is used to keep the building weather tight Step 18 Attach a strip to the hinged side of the middle opening doors These strips allow you to adjust the doors allowing for moistu...

Reviews: