P 5
Please retain product label and instructions for future reference
5
22
Step 8
Attach the “L” brackets to each
end of the ridge bar with
2x25mm screws per bracket.
*Ensure the brackets are flush
with the ends of the ridge bar.
Align the ridge bar between
the gables and secure to the
central uprights with 2x25mm
screws per bracket as shown in
the illustration.
8x25mm Screws
Step 7
Place the gable tops onto the window
panels, ensuring the boards interlock.
Secure in place using 4x50mm screws
per gable top, screwing in an alternating
pattern.
8x50mm Screws
Pre drill
hole
50mm
screw
11
Pre drill
hole
25mm
screw
12
7
7
Step 9
Attach 2x eaves frames to
the long side of each roof
sheet, ensuring the frames
are flush to the edges,
securing in place with
3x30mm screws per frame.
Place each roof sheet onto
the building and fix into
place using 12x40mm
screws per roof.
12x30mm Screws
24x40mm Screws
Pre drill
hole
30mm
screw
40mm
screw
Step 10
Secure the building
to the floor using
36x50mm screws.
*Ensure to screw
through the framing
into the floor bearers.
36x50mm Screws
Pre drill
hole
50mm
screw
5