![Mercia Garden Products 03DTSHRA1008FGC42TW-V1 General Instructions Manual Download Page 9](http://html.mh-extra.com/html/mercia-garden-products/03dtshra1008fgc42tw-v1/03dtshra1008fgc42tw-v1_general-instructions-manual_1772527009.webp)
P 9
Please retain product label and instructions for future reference
IMPORTANT:
Pre-drill before fixing screws.
Pre drill
hole
Step 22
40mm
screw
Before fully fixing the roof, check by eye
to see that the walls are straight by
standing to the sides of the building.
Use 40mm screws to fix the roofs
(No. 8
& 9)
down the sides, front and back of
the building.
Be sure that the screws attach into the
framing below.
24x40mm Screws
9
8
9
8
31
Pre drill
hole
Fix the roof framing together
using the “U” Channel
(No.31)
,
laying evenly over the framing,
secure using 6x30mm screws
Repeat for both sides of the roof.
12x30mm Screws
Step 23
Parts Needed -
No.31 QTY 2
30mm
screw
IMPORTANT:
Pre-drill before fixing screws.
Pre drill
hole
50mm
screw
Step 24
Secure the building internally to
the floors using 38x50mm screws.
*Ensure to screw through the
framing into the floor bearers.
38x50mm Screws
IMPORTANT:
Pre-drill before fixing screws.
Summary of Contents for 03DTSHRA1008FGC42TW-V1
Page 13: ... 2 1 3 4 ...
Page 14: ... 1 2 ...