background image

Please retain product label and instructions for future reference

             

P 12

             

26

26

30mm 

screw

Pre drill 

hole

Attach the two turn buttons 

(No.26)

 to the 

secondary door at the top and bottom using 

2x30mm screws.

*These turn buttons help to keep your doors 

straight during high & low levels of moisture 

content in the air.

2x30mm Screws

Step 31

Parts Needed -

 

No.26 QTY 2

 

 

                               

IMPORTANT: 

Pre-drill before fixing screws.

26

Pre drill 

hole

30mm 

screw

20

20

Attach a strip 

(No.20) 

to the hinged side of 

the Master and Secondary doors. Each strip 

should overlap onto the plain doors to ensure 

the gap is covered.

*These strips allow you to adjust the doors 

allowing for moisture absorption and 

reduction. 

6x30mm Screws

Step 32

Parts Needed -

 

No.20 QTY 2

 

 

                               

IMPORTANT: 

Pre-drill before fixing screws.

Please be aware you may need to adjust the doors once the building is fully constructed.

SILICONE

SEALANT

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Summary of Contents for 03DTSHRA1008FGC42TW-V1

Page 1: ...le you should avoid placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture ...

Page 2: ...450mm QTY 3 F2744 G 490mm 16 Cover Trim 12x40x2043mm QTY 11 S1240 2043mm 17 18 Fascia 12x60x1333mm QTY 4 S1260 1333mm Door Support Bar 27x44x2872mm QTY 1 F2744 2872mm 21 23 Rain Guard 28x44x680mm QTY 2 RG2844 680mm 22 Floor Support 28x28x400mm QTY 8 F2828 400mm 5 2 Small Panel QTY 4 AI S11SHPP284X2015 V1 1 Door Panel QTY 1 AI 03S11SHFCD2360X2015 V1 Window Panel QTY 2 AI 03S11SH1TFWC687X2007 V1 3 S...

Page 3: ...ely folding back into the building unrestrict ed 18x25mm Screws 18x30mm Screws Internal Pre drill hole 25mm screw 30mm screw 12 12 25 1 Step 2 Parts needed No 10 QTY 1 No 11 QTY 1 No 25 QTY 8 Pre drill hole 25mm screw 10 11 25 25 25 25 25 25 25 25 Turn the door panel No 1 over so the framing is on the flat surface Fix the master No 8 and secondary door No 9 to the attached plain doors with butt hi...

Page 4: ...Repeat this with the second Window and Door panel but the opposite way round as shown in the diagram 12x50mm Screws Pre drill hole 50mm screw Step 5 Parts needed No 3 QTY 2 No 4 QTY 2 IMPORTANT Pre drill before fixing screws Secure the floor No 7 to the Floor Blocks No 22 using 8x30mm screws per floor Repeat this for one other floor panel 16x30mm Screws Pre drill hole 30mm screw Step 6 Parts Neede...

Page 5: ...in and small panel but the opposite way round as shown in the diagram 12x50mm Screws Step 9 Parts needed No 2 QTY 2 No 5 QTY 2 Pre drill hole 50mm screw 5 2 2 5 Fix the corners of the small panel No 2 and the side panel No 4 with 50mm screws as shown in the illustration Fix the assembled plain panels No 5 together through the framing using 6x50mm Ensure to stagger screws to avoid colliding Do not ...

Page 6: ...Secure in place using 4x50mm screws per gable top screwing in an alternating pattern 8x50mm Screws Pre drill hole 30mm screw Step 14 Parts Needed No 14 QTY 4 Place the panel framing No 14 along the top of the panel at the front and back of the building and secure using 2x50mm screws per framing piece 8x50mm Screws IMPORTANT Pre drill before fixing screws 14 Pre drill hole 30mm screw 31 27 27 13 13...

Page 7: ...ewing at an angle as shown in the illustration Ensure to stagger the screws so as not to hit one screw with another 2x50mm Screws Step 17 Parts Needed No 15 QTY 2 IMPORTANT Pre drill before fixing screws Pre drill hole 50mm screw Fix the roof support blocks No 19 to the back and door panel upright fram ing ensure there is 15mm between the roof support bar and the panel framing secure with 2x50mm s...

Page 8: ...13 Make sure that you have got the roof panels the correct way round with the recess at the top of the apex as shown in the diagram From the top fix directly through the roof panels No 8 9 into the ridge bar No 13 below using 60mm screws Fix a 60mm screw through the roof panels No 8 9 into the Roof Support Bars No 15 It is essential that the ridge bar No 13 roof support bars No 15 and roof panel N...

Page 9: ...sure that the screws attach into the framing below 24x40mm Screws 9 8 9 8 31 Pre drill hole Fix the roof framing together using the U Channel No 31 laying evenly over the framing secure using 6x30mm screws Repeat for both sides of the roof 12x30mm Screws Step 23 Parts Needed No 31 QTY 2 30mm screw IMPORTANT Pre drill before fixing screws Pre drill hole 50mm screw Step 24 Secure the building intern...

Page 10: ... Fix the sheets into place using 132x felt tacks approximately 100mm apart 132x Felt Tacks Step 25 Parts Needed No 32 QTY 1 32 17 17 Pre drill hole 30mm screw Attach the cover trims No 17 to each corner of the building and across each joint between the fixed panels using 3x30mm screws per cover trim 33x30mm Screws 17 17 17 17 17 17 17 17 Step 26 Parts Needed No 17 QTY 11 17 IMPORTANT Pre drill bef...

Page 11: ...ith the door panel framing Secure the framing using 4x60mm screws externally through the front panel and a further 2x60mm screws through the side panels and into either end of the framing 6x60mm Screws Step 28 Parts Needed No 21QTY 1 Pre drill hole 70mm screw IMPORTANT Pre drill before fixing screws Drill 3x6mm holes into the framing in line with the barrell bolts these will act as the catch for t...

Page 12: ... 20 Attach a strip No 20 to the hinged side of the Master and Secondary doors Each strip should overlap onto the plain doors to ensure the gap is covered These strips allow you to adjust the doors allowing for moisture absorption and reduction 6x30mm Screws Step 32 Parts Needed No 20 QTY 2 IMPORTANT Pre drill before fixing screws Please be aware you may need to adjust the doors once the building i...

Page 13: ... 2 1 3 4 ...

Page 14: ... 1 2 ...

Reviews: