P 8
Please retain product label and instructions for future reference
P 11
Step 27
Parts Needed -
No.18 QTY 4
- No.24 QTY 2
18
18
24
24
18
18
Pre drill
hole
40mm
screw
Fix the fascias
(No.18)
and
finials
(No.24)
to the sides of
the building using 12x40mm
screws.
12x40mm Screws
IMPORTANT:
Pre-drill before fixing screws.
21
21
Place the Door support bar
(No.
21)
to the inside of the door panel
as displayed on the pictures. The
44mm side of the framing should
sit against the inside of the door
panel.
This framing will meet at each
side panel as show in the image,
and should be level with the door
panel framing.
Secure the framing using
4x60mm screws externally
through the front panel, and a
further 2x60mm screws through
the side panels and into either
end of the framing.
6x60mm Screws
Step 28
Parts Needed -
No.21QTY 1
Pre drill
hole
70mm
screw
IMPORTANT:
Pre-drill before fixing screws.
Drill 3x6mm holes into the
framing in line with the barrell
bolts, these will act as the catch
for the barrell bolts.
*You will need to unsecure the
barrel bolts at this point.
Step 29
IMPORTANT:
Pre-drill before fixing screws.
23
Pre drill
hole
40mm
screw
Fix the rain guards
(No.23)
above each window,
securing in place using
2x50mm screws per guard,
ensuring to screw through
the framing.
4x50mm Screws
Step 30
Parts Needed -
No.23 QTY 2
IMPORTANT:
Pre-drill before fixing screws.
Summary of Contents for 03DTSHRA1008FGC42TW-V1
Page 13: ... 2 1 3 4 ...
Page 14: ... 1 2 ...