Please retain product label and instructions for future reference
P 13
It is ESSENTIAL that you apply wood treat-
ment immediately after the building has
been assembled.
AFTER TREATMENT:
score around protective
cover on glazing and
carefuly peel
covering back
Step 27 (external)
Attach the last two cover strips
to the back gable of the
greenhouse using 3x30mm
screws per strip.
6x30mm Screws
Pre drill
hole
30mm
screw
6x6 Greenhouse
(10x6 Greenhouse with shed)
8x6 Greenhouse
(12x6 Greenhouse with shed)
Step 28 (external)
Once both buildings have been erected, secure
the greenhouse to the shed section by screwing
through the back of the greenhouse into the
shed at each corner using 6x70mm screws as
shown in the illustration.
6x70mm Screws
Pre drill
hole
70mm
screw
*Internal
Summary of Contents for 01DTSHAX0406SDFW-V1
Page 14: ...2 1 3 4...
Page 15: ...1 2...