5
Unscrew dipstick guide tube at exhaust
manifold, screw in (arrow).
6
Detach
cable (30) for accelerator
control, attach, press plastic guide (arrow) out of
its seat in the fulcrum lever (13) to perform this
step, and take
cable (30) out of the slot
in the fulcrum lever.
Compress plastic clip (28) and push clip together
with
cable to the rear through the holder
Adjust
cable (30) (30-325).
7
Unbolt strut at intake manifold. To perform
this step, unbolt 2 hexagon socket bolts (arrows)
on injection engine, bolt on.
Detach return spring for throttle body assembly
(below intake manifold), attach.
01.0904
Summary of Contents for 201.024
Page 1: ...Mercedes Benz Mercedes Benz of North America Inc Montvale NJ 07645 ...
Page 5: ...General technical data 00 ...
Page 12: ...Crankcase and cylinder head 01 ...
Page 98: ...01 418 Facing cylinder head mating face POI oooe 54 Data mating face 01 0904 418il ...
Page 104: ...Crankshaft assembly 03 ...
Page 184: ...ngine timing valvetrain 05 ...
Page 243: ......
Page 255: ...I Intake I Exhaust I Data PO6 0064 N Exhaust 05 0906 29013 ...
Page 261: ...5 Insert valves and measure distance A 05 0906 291i5 ...
Page 262: ......
Page 280: ......