Installation
46
Mellanox Technologies
Step 16.
Before placing the chassis in the rack, make sure to leave more room on the leaf (port
cables) side to allow room for cable management.
Figure 27: Placement of Chassis in Rack – Top View
Step 17.
Put the crate on the fork lift or a mechanical lift.
Figure 28: Fork Lift
Wooden
Hinged exten-
From
, 3 people should participate in the installation process.
Summary of Contents for Switch-IB
Page 2: ...Doc MLNX 15 4748 324 2 Mellanox Technologies...
Page 103: ...104 Mellanox Technologies Figure 77 InfiniBand QSFP Connector Symbol...
Page 104: ...105 Mellanox Technologies Figure 78 QSFP Connector Male and Female Views...
Page 111: ...112 Mellanox Technologies 6 7 8 9 10 11...
Page 112: ...113 Mellanox Technologies 12 13 14 15 16 17...
Page 113: ...114 Mellanox Technologies 18 19 20 21 WEEE 22 H 4 Chinese 1...
Page 114: ...115 Mellanox Technologies 2 3 4 5 6 7 8 r r 368...
Page 115: ...116 Mellanox Technologies 9 10 InfiniBand 11 12 13 14 15 UL CSA 16 QILQL DQG 8 6 9 5 9 39 9...
Page 116: ...117 Mellanox Technologies 17 18 19 20 WEEE 21 56 8 3 3 36 71 7...
Page 127: ...128 Mellanox Technologies 3 4 5 6 7 8 9 45 C 113 F 8 3...
Page 144: ...145 Mellanox Technologies 5 6 7 8 9 10 11 FP 368...