Installation
27
Mellanox Technologies
Figure 6: Crate Screws
Step 4.
Remove the nylon covers from the chassis.
Step 5.
Visually inspect the chassis, make sure that:
• There is no visible damage
• 10 PSUs are installed
Step 6.
Remove all protective plastic film from the sides and top of the chassis.
Unpack the system and check against the parts list to make sure that all the parts have
been sent. Check the parts for visible damage that may have occurred during shipping.
If anything is damaged or missing, contact your customer representative immediately.
Do not remove any of the blocks or the lock-down bars at this time.
Summary of Contents for Switch-IB
Page 2: ...Doc MLNX 15 4748 324 2 Mellanox Technologies...
Page 103: ...104 Mellanox Technologies Figure 77 InfiniBand QSFP Connector Symbol...
Page 104: ...105 Mellanox Technologies Figure 78 QSFP Connector Male and Female Views...
Page 111: ...112 Mellanox Technologies 6 7 8 9 10 11...
Page 112: ...113 Mellanox Technologies 12 13 14 15 16 17...
Page 113: ...114 Mellanox Technologies 18 19 20 21 WEEE 22 H 4 Chinese 1...
Page 114: ...115 Mellanox Technologies 2 3 4 5 6 7 8 r r 368...
Page 115: ...116 Mellanox Technologies 9 10 InfiniBand 11 12 13 14 15 UL CSA 16 QILQL DQG 8 6 9 5 9 39 9...
Page 116: ...117 Mellanox Technologies 17 18 19 20 WEEE 21 56 8 3 3 36 71 7...
Page 127: ...128 Mellanox Technologies 3 4 5 6 7 8 9 45 C 113 F 8 3...
Page 144: ...145 Mellanox Technologies 5 6 7 8 9 10 11 FP 368...