Rev 1.2
Mellanox Technologies
27
2.6
Initial Power On
The system’s input voltage is auto-adjusting for 100 - 240VAC, 50-60Hz power connections. The
power cords should be standard 3-wire AC power cords including a safety ground and rated for
15A or higher.
The system platform will automatically power on when AC power is applied. There is
no power system. Check all boards, power supplies, and fan tray modules for proper
insertion before plugging in a power cable.
Step 1.
Plug in the first power cable.
Step 2.
Plug in the second power cable.
Step 3.
Wait for the system upload process.
It may take up to five minutes to turn on the system. If the System Status LED shows
Red after five minutes, unplug the system and call your Mellanox representative for
assistance.
Step 4.
Check the System Status LEDs and confirm that all of the LEDs show status lights consistent
with normal operation (initially flashing and then moving to a steady color) as shown in
Figure 21 below. For more information, refer to “LEDs” on page 40.
Figure 21: System Status LEDs 5 Minutes After Power On
Summary of Contents for SB7700
Page 25: ...Rev 1 2 Mellanox Technologies 25 Figure 19 Locking Mechanism...
Page 60: ...Rev 1 2 Mellanox Technologies 60 5 6 7 8 9 10...
Page 61: ...Rev 1 2 Mellanox Technologies 61 11 12 13 14 15 16...
Page 62: ...Rev 1 2 Mellanox Technologies 62 17 18 19 20 21 WEEE 22...
Page 64: ...Rev 1 2 Mellanox Technologies 64 7 8 9 10 InfiniBand 11 12 13 PSU InfiniBand...
Page 77: ...Rev 1 2 Mellanox Technologies 77 4 5 45 C 113 F 8 3 6 7 8 9 10 InfiniBand InfiniBand...