SwitchX Switch EVB Hardware User Manual
Rev 1.5
Mellanox Technologies
27
12. Hazardous Radiation Exposure
13. Do Not use as a Shelf
14. UL Approved AC Power Cords
4.5.2
Mechanical Installation
The switch platform can be rack mounted and is designed for installation in a standard 19” rack.
The power side of the switch includes a hot-swap power supply module, a blank cover, and a hot-
swap fan tray. There are two possible air flow directions. Be sure that the switch air flow direc-
tion is compatible with your system, rack, and PSU. The connector side of the switch has the data
ports, system LEDs, and management connection ports.
The switch platform contains auto-sensing 100 - 240 VAC connections for the PSU.
The installer should use a rack capable of supporting the mechanical and environmental charac-
teristics of a fully populated platform.
Caution – Use of controls or adjustment or performance of procedures other than those
specified herein may result in hazardous radiation exposure.
CLASS 1 LASER PRODUCT and reference to the most recent laser standards:
IEC 60 825-1:1993 + A1:1997 + A2:2001 and EN 60825-1:1994+A1:1996+ A2:2001
Caution: Slide/rail mounted equipment is not to be used as a shelf or a work space.
For North American power connection, select a power supply cord that is UL Listed
and CSA Certified
3 - conductor, [18 AWG], terminated in a molded on plug cap rated at 125 V, [15 A],
with a minimum length of 1.5m [six feet] but no longer than 4.5m
For European connection, select a power supply cord that is internationally
harmonized and marked “<HAR>”,
3 - conductor, minimum 0,75 mm2 wire, rated at 300 V, with a PVC insulated jacket.
The cord must have a molded on plug cap rated 250 V, 10 A.
The rack mounting holes conform to the EIA-310 standard for 19-inch racks. Take pre-
cautions to guarantee proper ventilation in order to maintain good airflow at ambient
temperature. Cable routing in particular should not impede the air exhaust from the
chassis.