
INSTALLATION
3-11
MA-5066-ENG
PS200 DRUM MELTER MANUAL
2. Thread the power cord (max. Ø12.5mm) through the electrical wall
bushing Pg16 and fasten it to the inside anchor, making sure that the
cord reaches the power card connector.
3. Connect the two wires from the start-up signal to the terminals XE11
and XE12. This is a double terminal, which makes it necessary to
connect each wire in one of the two holes in the terminal. Since this
contact is not under voltage, there is no connection polarity.
4. Make sure that the cables are firmly attached by the terminal screws.
Warning:
It must be connected to 24 AC or DC voltage with a maximum
current of 1A.
Light tower signals
These signals are internally connected, with the external associated pairs, to
the following terminal blocks:
Signal
External
Drum melter ready (temperatures OK)
15X4.1/ 15X4.2
Motor running (pump rotation)
15X4.7/ 15X4.8
Half empty drum
15X4.3/ 15X4.4
Empty drum
15X4.5/ 15X4.6
Alarms
XE11/ XE12
Summary of Contents for PS200
Page 1: ...MA 5066 ENG 250220 GLUING SOLUTIONS ADHESIVE MELTER PS200 DRUM UNLOADER INSTRUCTIONS MANUAL ...
Page 8: ...FOCKE MELER GLUING SOLUTIONS TABLE OF CONTENTS This page is intentionally left blank ...
Page 34: ...FOCKE MELER GLUING SOLUTIONS S A 3 12 INSTALLATION This page is intentionally left blank ...
Page 68: ...FOCKE MELER GLUING SOLUTIONS S A 4 34 MELTER OPERATION ...
Page 75: ...ELECTRICAL DRAWINGS 7 1 MA 5066 ENG PS200 DRUM MELTER MANUAL 7 ELECTRICAL DRAWINGS ...
Page 78: ...FOCKE MELER GLUING SOLUTIONS S A 8 2 PNEUMATIC DIAGRAMS 1 2 3 4 5 6 9 8 7 11 12 10 13 14 ...
Page 80: ...FOCKE MELER GLUING SOLUTIONS S A 8 4 PNEUMATIC DIAGRAMS This page is intentionally left blank ...
Page 82: ...FOCKE MELER GLUING SOLUTIONS 9 2 SPARE PARTS LIST A STRUCTURE 7 5 4 6 2 3 9 8 1 ...
Page 84: ...FOCKE MELER GLUING SOLUTIONS 9 4 SPARE PARTS LIST B PLATEN ENSEMBLE 2 3 4 5 7 8 6 1 ...
Page 98: ...FOCKE MELER GLUING SOLUTIONS 9 18 SPARE PARTS LIST This page is intentionally left blank ...