
Meikai ENERGY
Page
8
Copyright
MeiKai
ENERGY 2012
REV 1.0
Meikai Micro-inverter Installation Guide
Please read the Installation and Operation Manual before installing a Meikai Micro-inverter.
WARNING:
Perform all electrical installations in accordance with all local electrical
codes.
WARNING:
risk
of
electricity
shock
,
the
grounding
line
may
become
live
if
not
grounded
properly
.
Meikai Micro-inverter Installation Kit
Major parts:
Except the Micro-inverter, module, rack and hardware tools, the following items are needed to establish
a system:
·
protective caps
·
mounting bracket
·
AC interconnect cable
·
AC junction box
Other parts and tools required:
·
grounding cable and washer
·
hardware tools for mounting modules to the rack
·
socket wrenches
·
screwdrivers
·
torque wrenches
Installation Procedure
To install a Meikai Micro-inverter system involves 6 key steps as following:
1. check and install the AC branch circuit junction box
2. attach Micro-inverter to the racking
3. connect the Micro-inverter to the AC branch cable
4. grounding the system
5. connect the PV modules
6. Complete the Meikai Micro-inverter installation map.
Each of the detailed installation steps in the following sections is numerically referenced in the
installation diagram below.
WARNING
:
DO NOT
connect the Meikai Micro-inverter to the utility grid until you have
completed all of the installation procedures as described in the following sections.