Assembly instruction
The Top-Climate-System is generally supplied in components as a modular system. Each sys-
tem is designed to meet the individual requirements of the customer.
Important information!
The system must always be thoroughly flushed before being put into operation. For
this purpose, the ball valves at the ends of the nozzle lines are opened after the as-
sembly of the lines and all lines are thoroughly flushed. The first flushing of the sys-
tem must take place without nozzles. Only after flushing the mounting of the noz-
zles is the last step to complete the system.
3.1
Installation of the pump unit
Place the pump unit on a even, horizontal, clean floor that is easily accessible and adequately
ventilated. Instead of placing the pump unit on the floor, it can alternatively be mounted to a flat
vertical wall using the optional wall mounting kit (Art. 7290). Depending on the wall, suitable
dowels/screws must be used for horizontal mounting of the bracket. The machine feet can be
screwed to the angle plate in prefabricated holes. The pump unit is then suspended from the
holder in a vibration-decoupled manner and fixed with nuts.
Important information!
Check whether a red transport plug still closes the pump housing. If this is the case,
replace it with the supplied oil vent screw. Check the oil level and refill if necessary
(15W-40).
Remove the protective foil from the attached high-pressure hose and connect it to the connect-
ing pipe by means of a cutting ring fitting (remove union nut and cutting ring on one side). Alter-
natively, a PressFix fitting with a suitable connection for the hydraulic hose can be used for the
connection (Art. 7409). If optional modules are used, the hydraulic hose is connected to the re-
spective module (see chapter 3.3
“Installation of additional modules”).
The pump unit is designed for connection to a MEIER-BRAKENBERG Touch Controller. With-
out the MEIER-BRAKENBERG Touch Controller no correct function of the system can be guar-
anteed. The pump unit must not be connected to the power supply until
“First start-up” (chapter
4.1)!
(Art. 7290)
Summary of Contents for D-Line + MBWeich 4
Page 46: ...Seite 46 7 Anschlusspl ne Wiring plans 7 1 Touch Controller MBWEICH3...
Page 47: ...Seite 47 7 2 Touch Controller MBWEICH4...
Page 48: ...Seite 48 7 3 Touch Controller LC 2...
Page 49: ...Seite 49 7 4 Touch Controller LCS 2...
Page 50: ...Seite 50 7 5 Touch Controller LCM...
Page 51: ...Seite 51 7 6 Touch Controller LCM vario...
Page 52: ...Seite 52 7 7 Erweiterungsboxen Extension boxes...
Page 53: ...Seite 53 7 8 Anschlussschema Vario System Connection scheme Vario system...
Page 54: ...Seite 54 7 9 Pumpe inkl MBWEICH3 Pump incl MBWEICH3...
Page 55: ...Seite 55 7 10 Pumpe Sonderspannung Pump special voltage...
Page 56: ...Seite 56 7 11 Pumpe Vario inkl LCM vario Pump Vario incl LCM vario...