3 TESTING POWER SYSTEM COMPONENTS
to verify the existence of a shield or a concentric-winding
arrangement.
Three-winding transformer test connections are described
in Table 3.2.
Table 3.2
Three-winding transformer test connections
Te
st
N
o
.
In
su
la
ti
o
n
te
ste
d
Low voltage lead
configuration
Test lead
connec-
tions to
windings
R
em
ark
s
Te
st
m
o
d
e
M
ea
sur
e
G
ro
un
d
G
uar
d
H
ig
h
v
o
lt
ag
e
Re
d
B
lu
e
1
CHG+
CHL
GSTg-B
Red
Blue
H
L
T
L Grounded
T Guarded
2
CHG
GSTg-
RB
Red &
Blue
H
L
T
L & T
Guarded
3
CHL
UST-R Red Blue
H
L
T T Grounded
4
CHL
–
Test 1 minus Test 2
–
–
–
Calculated
intercheck
5
CLG +
CLT
GSTg-
BR
Blue
Red
L
H
T
T Grounded
H Guarded
6
CLG
GSTg-
RB
Red &
Blue
L
H
T
T & H
Guarded
7
CLT UST-RB Blue Red
L
H
T H Grounded
8
CLT
–
Test 5 minus Test 6
–
–
–
Calculated
intercheck
9
CTG +
CHT
GSTg-B
Red
Blue
T
H
L
H Grounded
L Guarded
10 CTG
GSTg-
RB
Red &
Blue
T
H
L
H & L
Guarded
11 CHT
UST-R Red Blue
T
H
L L Grounded
12 CHT
–
Test 9 minus Test 10 –
–
–
Calculated
intercheck
Equivalent Circuit
Note: Short each winding on
itself.
Measurement Interchecks (Cal-
culated)
Capacitance
Watts
C
4
= C
1
- C
2
W
4
= W
1
- W
2
C
8
= C
5
- C
6
W
8
= W
5
- W
6
C
12
= C
9
- C
10
W
12
= W
9
- W
10
Note: Subscripts are test num-
bers
H
High-voltage winding
L
Low-voltage winding
T
Tertiary winding
G Ground
Autotransformers
In the design of an autotransformer, the secondary winding
is actually part of the primary winding. For a given power
output, an autotransformer is smaller and cheaper than a
conventional transformer. This is particularly true if the
ratio of the incoming line voltage to outgoing line voltage
lies between 0.5 and 2.
Autotransformers may have a tertiary winding. If so, both
primary and secondary bushings are shorted together and
the tertiary bushings are shorted to each other. The auto-
transformer is then tested as a two winding transformer.
Individual tests should be performed on each bushing if
they are equipped with a test tap.
If the autotransformer does not have a tertiary winding,
short the high voltage bushings and the low voltage bush-
ings together and perform a GST test. Test voltage should
be suitable for the rating of the low voltage winding
Transformer excitation current tests
Transformer excitation current tests are helpful in deter-
mining possible winding or core problems in transformers,
even when ratio and winding resistance tests appear normal.
Excitation tests should be conducted routinely along with
power factor testing.
Test connections
Test connection described in table 3.3.
Summary of Contents for DELTA 4000
Page 2: ......
Page 5: ...ZM AH02E DELTA4000 5...
Page 9: ...ZM AH02E DELTA4000 9 1 Introduction...
Page 15: ...ZM AH02E DELTA4000 15 2 Interpretation of measurements...
Page 43: ...ZM AH02E DELTA4000 43...
Page 46: ...46 DELTA4000 ZM AH02E...
Page 47: ...ZM AH02E DELTA4000 47...