7
Rigging the fixture
Caution!
1.
The installations must be carried out by an authorized dealer or trained professional.
2.
Unit may cause severe injures if you have doubts concerning the safety do not install.
3.
Unit is to be 24inches away from flammable materials (decoration material)
4.
Use high quality installation equipment to hang unit.
When rigging a unit it is very important that you follow common safety procedures. Rigging requires extensive experi-
ence including but not limited to calculating working loads, material being used and periodic safety inspections. If you
lack these qualifications, do not attempt the installation yourself, instead use a professional structural rigger.
When rigging the unit always be secured with a secondary safety attachment. The installation location of the projector
has got to be built in the way that it can hold 10 times the weight for 1 hour with out any harming. Installation should be
checked at least one time a year by a skilled person.
Rigging the fixture
Caution!
1.
The installations must be carried out by an authorized dealer or trained professional.
2.
Unit may cause severe injures if you have doubts concerning the safety do not install.
3.
Unit is to be 24inches away from flammable materials (decoration material)
4.
Use high quality installation equipment to hang unit.
When rigging a unit it is very important that you follow common safety procedures. Rigging requires extensive experi-
ence including but not limited to calculating working loads, material being used and periodic safety inspections. If you
lack these qualifications, do not attempt the installation yourself, instead use a professional structural rigger.
When rigging the unit always be secured with a secondary safety attachment. The installation location of the projector
has got to be built in the way that it can hold 10 times the weight for 1 hour with out any harming. Installation should be
checked at least one time a year by a skilled person.