Air & Surface Steriliser System
REVISION: 04/2020 | page 6 of 16 INSTALLATION & OPERATING MANUAL
Chapter 6. INSTALLATION INSTRUCTIONS
6.1 INSTALLATION STEPS
6.1.1 Equipment needed:
6.1.2 It is important to first identify the best location for the unit. Ensure you have read Chapter 5 Location Advice.
6.1.3 Measure 2.2 metres AFFL. Mark and drill holes using template provided on packing box.
6.1.4 Insert wall plugs into drilled holes. Use hammer to fit wall plugs into position. Insert screws provided into
wall plugs and screw into position, leaving 5mm to hang the HyGenikx unit.
6.1.5 Align pockets on the back panel with screws and hang the HyGenikx unit into position as shown.
6.1.6 Connect the power cable to a suitably isolated socket or fused spur.
6.1.7 Before the unit is ready to use, you will need to install the lamp and battery. Proceed to Chapter 7.