ICE FOG Compack
TM
User Guide120818, Rev: B/a
10 / 19
STARTUP
PROCEDURE
1.
Remove the front cover, if needed use the 5” flexible hose placed in the cover.
2.
Open the back door.
3.
Screw the L-CO
2
hose (gauge side) to the liquid CO
2
bottle (50 lbs or 75 lbs, equipped
with a siphon / dip tube) or to the refrigerated low pressure liquid CO
2
Dewar.
Do not forget to put the Teflon washer
4.
Screw the other side of the L-CO
2
hose in the brass bulkhead inside the generator.
5.
Open the L-CO
2
valve.
6.
To fill the fluid reservoir, disconnect unit before adding Fog Fluid. If it is pressurized,
depressurize the reservoir by turning OFF the pressure switch located on the back
panel of the generator.
7.
Unscrew the brass cap
8.
Pour the MDG Low Fog Fluid until it reaches the inside bottom of the opening.
Avoid overfilling.
9.
Screw back the closure and make sure it is hand tightened.
10.
Turn back ON the pressure switch.
11.
Plug the AC cord 115 V or 230 V, depending on the voltage of the generator.
12.
Plug the remote control in the connector.
13.
Place the fog delay potentiometer knob at maximum.
14.
Press the Power switch on the remote control, a red LED will turn on. Then a yellow
LED will turn ON indicating “HEAT ON”.
15.
Wait 8 to 10 minutes until the green Ready LED turns on.
16.
The generator is now ready to operate.
17.
Press the Smoke switch.
During the fog delay (approximately 30 seconds), only the CO
2
will come out. This is to
cool down the cooling chamber of the generator. After 25 to 30 seconds, the fog output
will start.
Summary of Contents for ICE FOG Compack
Page 2: ...ICE FOG CompackTM User Guide120818 Rev B a 2 19 Intentionally left blank...
Page 16: ...ICE FOG CompackTM User Guide120818 Rev B a 16 19 TECHNICAL DIMENSIONS...
Page 18: ...ICE FOG CompackTM User Guide120818 Rev B a 18 19 DECLARATION OF CONFORMITY...
Page 19: ...ICE FOG CompackTM User Guide120818 Rev B a 19 19 NOTE...