![MCZ JAZZ Hydromatic 30 Acs H1 Installation Manual Download Page 22](http://html1.mh-extra.com/html/mcz/jazz-hydromatic-30-acs-h1/jazz-hydromatic-30-acs-h1_installation-manual_1756384022.webp)
S
S
x
y
x
y
S
20
4-INSTALLATION AND ASSEMBLY
PREPARATION AND UNPACKING
The packaging consists of a recyclable cardboard box in line with RESY standards and a wooden pallet. All packaging materials can be
reused for similar use or disposed of as urban solid waste, in accordance with current regulations.
After having removed the packaging make sure the product is intact.
Handle the product with suitable means paying attention to the applicable safety regulations in force. Do not turn the
packaging over and handle the majolica parts with care.
The stoves are delivered in a single package with ceramic panels packaged
in a box and placed on top of the structure. Open the package, remove the
cardboard, polystyrene and any straps and position the stove in the preset
place making sure that it complies with the requirements.
The stove body or unit must always be kept in a vertical position when
handled, and handled using trolleys only. Pay particular attention to the
door and its glass, protecting them from mechanical knocks that would
compromise their integrity.
If possible, unwrap the stove near the chosen area of installation.
To remove the stove from the pallet, you must remove the screws “x” and “y”
and plate “s” from the stove. There are two S-fixing brackets, one at the front
and one at the back.
REMOVAL OF THE PACKAGE BRACKETS
PACKAGING