C
22
5-PLUMBING CONNECTION
PLUMBING SYSTEM CONNECTION
IMPORTANT!
If installation of the product involves interaction with another, pre-existing system complete with heating
equipment (gas boiler, methane boiler, diesel boiler, etc.), contact qualified personnel, who subsequently will be
responsible for conformity of the system in compliance with the applicable law in force.
The Company declines all responsibility for damage to persons or things in the event of failed or incorrect operation,
if the aforementioned warnings are not complied with.
CONNECTION DIAGRAM FOR PRIMULA–ORCHIDEA HYDRO STOVE
A1
3/4”M heating water delivery
A2
3/4”M heating water return 3/4”M
C
3 bar 1/2” M safety valve
E
3/4”M system draining and emptying
CONNECTION DIAGRAM FOR THE PRIMULA-ORCHIDEA HYDRO STOVE EQUIPPED WITH KIT FOR DOMESTIC HOT
WATER PRODUCTION
A1
3/4”M heating water delivery
A2
3/4”M heating water return 3/4”M
C
3 bar 1/2” M safety valve
E
1/2”F system emptying
B1
Domestic hot water delivery
B2
Domestic hot water return
Summary of Contents for GARDENIA
Page 16: ...14 3 TECHNICAL DRAWINGS AND CHARACTERISTICS DIMENSIONS OF MARGHERITA ANDGARDENIA HYDROVERSION...
Page 65: ......
Page 66: ......
Page 67: ......