McQuay IM 487-4
37
Introduction
Vestibule Assembly Instructions
An accessory vestibule is available to provide additional
piping space for coils installed in a four-foot section. A
vestibule is required to maintain door access on a combination
heating and cooling section. Assemble the vestibule to the unit
part by part as shown in Figure 41.
Note:
The door, hinge, and latch assemblies from the unit are
used on the vestibule.
Step 1
Remove door from section where vestibule is to be located by
removing screws holding hinges to upright support (leave
hinges on door). Set door aside and save for Step 4.
•
Remove door latch assembly from other side upright
support. Use offset Phillips screwdriver or a wrench to
remove screws holding latch assembly in place. Save door
latch assembly, screws and bushings for Step 4.
Figure 41. Step 1 illustration
Step 2
Remove gasketing around door flange and save for use on
vestibule. See Step 4. Remove door and save for Step 4.
Figure 42. Step 2 illustration
Door Latch Assembly
Door
Gasketing
Door Prop
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com