22
McQuay IM 487-4
Introduction
Figure 26. Typical power wire entrance, curb view (RDS 800–802 shown; for exact values, refer to submittal)
Post and Rail Mounting
When mounting by post and rail, run the structural support the
full length of the unit. Locate the structural member at the base
of the unit as shown in Figure 27, assuring the I-beam is well
supported by the structural member.
If resilient material is placed between the unit and the rail,
insert a heavy steel plate between the unit and the resilient
material to distribute the load. Seal cabinet penetrations
(electrical, piping, etc.) properly to protect against moisture
and weather.
Figure 27. Post and rail mounting
Unit length minus 6.4
12.1
See Detail A
Detail A
3.4
5.1
0.9 Dia.
K.O.
3.0 Dia.
K.O.
4.6
4.8
2.0
2.1
4.3
3.1
9.7
E
8.0
97.0
76.0
6.0
7.5
20.0
1.5
6.0
6.8
RA
OPNG
B
2 Typ
A
A
D
C
D
4 Typ
A
B
B
SA
OPNG
RPS only
CAUTION
The unit must be level side to side and over the entire length.
Equipment damage can result if the unit is not level.
5" *
(127mm)
99" RAH
(2515 mm)
94" RDS
(2388 mm)
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com