22
4111-0070 — May 2017
June 2017
Loading/Unloading — Position.
OPERATION
NOTE: If end unloading is required, see End
Loading/Unloading Instructions on page 23.
1. Check to make sure RRH dock leveler is
positioned squarely on transport vehicle.
2. Instruct transport vehicle to remain at the dock
until the loading or unloading process has been
completed.
Ramp Loading/Unloading Instructions
3. Lower the platform lip onto transport vehicle as
follows:
A. Lower platform by depressing and holding
LOWER(A) button.
B. Make sure that the lip is fully extended and
supported on the transport vehicle along the
entire width of the platform with at least 4
in. (102 mm) of lip contacting the transport
vehicle bed.
6. When loading or unloading is finished, raise the
platform by depressing and holding RAISE(B)
button.
9. Indicate to transport operator that transport
vehicle may leave the dock.
A—LOWER Button
B—RAISE Button
4. Proceed with loading or unloading the transport
vehicle.
5. If end loading is necessary, see End Loading/
Unloading Instructions on page 23
Operating Instruction
A
B