17
4111-0070 — May 2017
June 2017
INSTALLATION
Placard Installation Instructions
Control Box
Conduit
Nylon Tie
Placard
• Owner/Users are responsible for the installation and placement of product
placards.
• Make sure placard is in plain view of dock leveler and/or vehicle restraint
operations.
• Suggested placement of placard is near control box attached to electrical
conduit by using nylon tie. If there is no control box present, mount placard
on wall to the immediate left of leveler at eye level.
(Placard placement
shown as reference
only.)