background image

CartPark Architectural  |  

Page 8 of 11

11

Installing the roof panels

Remove the protective film from both sides. From the outside of the 
unit, slide both outer edges of the roof panel measuring 53.75” into 
the grooves of the roof slope as shown. Slowly guide the roof panel 
into place and be careful not to peel double sided tape on cross 
member. Once near the top, guide the top edge of the roof panel 
into the recessed area at the ridge as shown. You may need to push 
roof panel up from the inside of the unit to allow it to slide into the 
ridge groove.

Repeat this step to install the remaining roof panels.

12

   53.75in

1365mm

  

   55.13in

1400mm

  

Roof Slope

Ridge

Cross Member
Tape

Outer

facing out

Roof Slope

Cross Member

Push down along center

to adhere roof panels to

double sided tape.

Adhering Roof Panels to Roof Cross Members

Make sure the roof panels are clean and dry prior to peeling off 
the double sided tape on top of the cross members. Peel off the 
protective paper from the double sided tape on top of the cross 
members. You will need to push panel upwards and away from 
cross member. Press roof panel into the cross member from the 
outside to make the panels adhere to the double sided tape.

Repeat for the remaining roof panels.

Important:

 Make Sure all Roof panels adhere to the double sided tape on cross members.

Summary of Contents for CartPark Architectural

Page 1: ...BCR 10 2 Roof Frame Assembly 164 x56 0 x2 0 FRAME CCPASFABRF 4 Roof Slope 53 6875 LONG CCPASFABRS 4 End Roof Slope with Tri Glass Panel Mounting Holes CCPASFABRSE 2 Top Ridge with Weather Foam Tape 164 LONG CCPASFABRDG 2 Bottom Sill 164 LONG CCPASFABSILL 6 Roof Cross Member with Double Sided Tape 52 75 LONG CCASFABCM ITEM QTY DESCRIPTION McCUE DRAWING OR PART 11 6 Roof Panels Acrylic Solid Sheet 5...

Page 2: ...eaning Rags 1 200 pounds 544 kilograms of sand pea stone or gravel for ballasting Screw wax 85oz included Important Assemble on a flat level surface All cart corrals should be inspected on a regular basis for damage McCue recommends a minimum of two inspections per year in the spring and fall Any damaged pieces should be replaced with McCue replacement parts 2042mm 2032mm ID 104 0 2642mm 712mm 164...

Page 3: ...s coated with wax at the front and back of the vertical posts Do not over tighten the screws Repeat this step to assemble the left side Pieces should be protected from scratches during the installation process 1 Back Right Front Bottom Siderail Notch Cut Back Right Back Left Stopbar Opening Stand sides upright When both left and right side frames are complete stand sides frame upright making sure ...

Page 4: ...ost Secure Stopbar to right and left vertical post with 4 Taptite 20x1 0 screws coated with wax from the outside of the unit Do not over tighten screws 4 Stopbar Notch Cut Overhang Left Top Rail Cut out opening Slide Left Top Rail into left vertical uprights Slide Left Top Rail into left frame vertical uprights so that the overhang leans toward the front of the unit Cut out openings should face in...

Page 5: ...s Rail Open end of Cross rail Slide Right Toprail into Cross Rails and into the right vertical uprights 1 Slide right Toprail into the open ends of the crossbars 2 Once in place lift Toprail up and over uprights so that the cross rails come off the uprights 3 Slide top rail over uprights and 4 Lower into the open ends of the uprights Secure Toprails to uprights with 16 20x1 0 Taptite screws coated...

Page 6: ...he front and back of the roof assemblies should be flush with front of horizontals 8 0 66in 17mm Ridge Top Ridge Roof panel Groove Right Toprail Left Toprail Flush Temporary secure roof frame assemblies to Right and Left Toprails Secure the outside edges of the roof frame assemblies to the Left Toprail and Right Toprail at three of the holes with 3 Taptite 20x1 0 screws wax coated per side Do not ...

Page 7: ...cure roof frame Assemblies at the ridge with 7 20x1 3 4 Long Hex Washer Head Screws and 7 20 Serrated Washer Nuts Important Careful not to rip foam weatherstrip tape and do not over torque screws 10 Roof Frame Assembly Foam Tape s s s s s s Secure Roof Frame Assemblies to Toprails Secure Roof Frame assembly to both Toprails with four additional Taptite 20x1 0 screws coated with wax per side Retigh...

Page 8: ...his step to install the remaining roof panels 12 53 75in 1365mm 55 13in 1400mm Roof Slope Ridge Cross Member Tape Outer facing out Roof Slope Cross Member Push down along center to adhere roof panels to double sided tape Adhering Roof Panels to Roof Cross Members Make sure the roof panels are clean and dry prior to peeling off the double sided tape on top of the cross members Peel off the protecti...

Page 9: ...e protective film from both sides of the tri glass panel Locate one tri glass panel onto the front of the unit so that its flush with the top perimeter of roof line Secure tri glass panel to roof frames with 8 20 x 1 0 Pan head Taptite screws coated with wax and 8 IDx long aluminum shoulder spacers Slide aluminum bottom support onto bottom of tri glass panel until both holes are aligned with frame...

Page 10: ...321mm towards vertical uprights Barrier Base Lid Cap Barrier Base Ballasting with Pea Stone Sand or Gravel Make sure unit is square and that is positioned straight and parallel inside parking space Important ballast Cart Corral unit with sand pea shone or gravel Fill each barrier base with 300 pounds of sand pea stone or gravel The entire unit should be ballasted with a total weight of 1200 pounds...

Page 11: ...s into the vertical uprights Locate lid cap on top of barrier base and push down until the sides of lid cap locks and sit flush with barriers base Repeat step to the remaining lid caps Important Make sure all lid caps are sitting flush with barriers and locked 18 Inspect and complete Go over entire unit and make sure every hole has a screw Your unit is now complete ...

Reviews: