
9
5. Start-up
5.1 Initial switching on
•
The installation and repair works must only be carried out by a specialist.
•
Prior to switching on the split & merge station for the first time check the wiring for
completeness, short-circuit and earth connection.
•
Line connector: Connect the supply line directly to the unwind via the designated
Cecon plug.
•
Control wire: See documentation or alternatively, via a 5pol. Control plug.
•
Connect the slit motor to the
MBO
unwind via the two plugs.
•
Ensure right rotating field.
•
Connect the compressed air line (6bar) directly to the existing system (line) or a
suitable compressor.
•
Make sure that all enclosures and coverings are shut.
•
See that the machine is aligned.
•
Please pay attention to all safety precautions.
•
Should damages become visible, the Split & Merge Station must not be operated.