MBO SPM 520 Instruction Manual Download Page 6

6

1.2 Safety officer 

Operator is any natural or legal person, who uses the Split & Merge Station or on
whose instructions the Split & Merge Station is used.

The operator or his safety officer must guarantee that

-

all relevant regulations, references and laws are adhered to.

-

only qualified employees work on and with the Split & Merge Station.

-

the operator is notified on the various risks and dangers, which emanate from
the Split & Merge Station for man and machine.

Qualified employees are persons who are authorised by the safety officer, based on 
their training, experience, instruction and knowledge on relevant standards and 
provisions, accident prevention regulations and operating conditions, to carry out the 
required operations and be able to identify and prevent potential dangers. (Definition 
for skilled personnel according to IEC 364). 

1.3 Electrical connection

 

The installation and repair works must only be carried out by a specialist.

The applicable national accident prevention regulations shall be observed for

 

work on live parts.

The electrical installation shall be carried out in accordance with the pertinent

 

regulations (e.g. line cross section, safeguarding, ground wire connection etc.)

 

Furthermore, notes are available in the Split & Merge documentation.

In connection with another module e.g. 

MBO

 sheeter or unwind

 

is connected via 

four multipoint connectors.
( Cekon 16A for power supply (compressor) and one 5pol. Control plug for the 24

 

VDC supply for the antistatic unit).
The splitter motor is connected via two separate plugs to the unwind or cross

 

cutter.

The electric motors used are arranged on the right rotating field in the split &

 

merge station.

It is imperative to observe the safety instructions described in chapter 1! 

Attention Danger: 

¾

Personal safety: 

Check whether all terminals are voltage-free before working on

the machine.

¾

Disregarding of the safety instructions: 

there is the threat of death of serious

injury.

¾

Caution: property damage: 

Incorrect handling of the machine can cause

damage to the machine and its surrounding area.

Summary of Contents for SPM 520

Page 1: ...Instruction Manual SPLIT MERGE STATION SPM 520...

Page 2: ...s 2 1 Specification 7 2 2 Connections Dimensions 7 3 General Description 8 4 Installation 8 5 Start up 5 1 Initial switching on 9 5 2 Schematic design of Split Merge Station 10 5 3 Replacement part li...

Page 3: ...ht in the moving parts Always keep the machine casing shut Retrofitting modifications or alterations to the Split Merge Station are strictly forbidden You must first consult MBO Use the appropriate sa...

Page 4: ...tly or not operated as intended Because the machine performs rotating pivoting as well as mechanical and electrical work Also by adhering to the functionality described in this instruction manual ther...

Page 5: ...rtation Caution damage to components Damage caused by improper transportation On acceptance of the machine pay attention to packaging damage and report this immediately to the manufacturer Safety note...

Page 6: ...by a specialist The applicable national accident prevention regulations shall be observed for work on live parts The electrical installation shall be carried out in accordance with the pertinent regul...

Page 7: ...ality 36gr m 200gr m Slit registering 5mm 2 2 Connections Dimensions Electrical connection 3 x 16A 380V 50Hz N PE 24VDC for antistatic unit optional Compressed air line PK 4 hose with quick release de...

Page 8: ...tion the trained personnel should ensure that the machine is arranged horizontally in machine and transverse direction Also the Split Merge Station must be in direct alignment to the existing system b...

Page 9: ...unwind via the designated Cecon plug Control wire See documentation or alternatively via a 5pol Control plug Connect the slit motor to the MBO unwind via the two plugs Ensure right rotating field Conn...

Page 10: ...10 5 2 Schematic Design of Split Merge Station 5 2 Schematic Design of Split Merge Station Comment Please obtain article description order number from the table in fig 5 3...

Page 11: ...11 5 3 Replacement list of Split Merge Station Fig 5 3 Replacement list of Split Merge Station e g the toggle 28 in the picture has the order number GN 323 100 K10 D...

Page 12: ...12 5 4 Threading paper web Fig 5 4 1 Entry to Split Merge Station Fig 5 4 2 Entry and centre piece of Split Merge Station...

Page 13: ...of entry directly to the centre guide roller at the exit Afterwards you thread the paper web between both with approx 45 arranged guide rollers and by doing so the lower of the two is supported with a...

Page 14: ...nal and transverse registering not set Incorrect setting Remedy Connect the main and control line Reset the emergency circuit Check the curved tooth coupling for passability and tighten the grub screw...

Reviews: