APPENDIX A
COMPUTER BATCH AND LENGTH CONTROLLER
A - 4
original value.
Push Button and Front Panel Selector Switches
Shear
Press [Shear] to manually activate the shear.
Note:
The MP465 controller allows this switch to
operate when the machine is stopped.
Halt
Select [Halt] to load a coil and to stop the machine
Run
Select [Run] to start the machine after a job has been
programmed
Jog (Forward
and Reverse)
When the machine is in manual mode (i.e., the Run button is
not lit), turn and hold the Jog switch clockwise to jog the
material forward, turn and hold the Jog switch counter-
clockwise to jog the material in reverse.
This switch is inactive when the Run switch is lit.
Power
This switch turns the controller on and off.
•
Turn the switch to the right to apply power to the
controller unit
•
Turn the switch to the left to remove power
Note:
If the controller unit has been wired to by-pass this switch, the position of the
switch will have no effect on the controller.
Program a Job
Jobs are composed of a quantity of a specified length. You can program up to 50 different
quantities and lengths into the controller. To program a job,
1. Select
[Program]
. The current data entry field highlights; once new data has
been entered, the data field starts blinking.
Note:
Pressing
[Clear]
while the data field is blinking re-loads the
original value into the data field. Pressing
[Enter]
saves new data and
highlights the next field.
2. In the
Job Number
field, enter a number to assign to this job (a value between 1 and
50).
3. In the
Quantity
field, enter the number of parts you want to create (up to 999).
Summary of Contents for NTM BG7
Page 1: ......
Page 11: ...CHAPTER 4 ELECTRICAL CONTROLS AND OPERATION 8 Figure 1 Controls...
Page 12: ...CHAPTER 4 ELECTRICAL CONTROLS AND OPERATION 9 Figure 2 Main Control Cable...
Page 15: ...CHAPTER 5 REEL STANDS REELS AND EXPANABLE ARBORS 12 Figure 5 Expandable Arbor Set Up...
Page 17: ...CHAPTER 5 REEL STANDS REELS AND EXPANABLE ARBORS 14 Figure 6 Expandable Reel Assembly...
Page 20: ...CHAPTER 6 HYDRAULIC SYSTEMS 17 Figure 7 Hydraulic System Overview...
Page 33: ...CHAPTER 13 HOOK ASSEMBLY OPTIONAL 30 Figure 20 Bead Roller Adjustment...
Page 43: ......
Page 50: ...1 6 2 6 5 E 3 3 r d D r S t e 4 0 A u r o r a C O8 0 0 1 1...