Component Testing Procedures
!
WARNING
To avoid risk of electrical shock, personal injury or death; disconnect power and gas to oven before servicing,
unless testing requires power and/or gas.
©2004 Maytag Services
16023522
15
Illustration Component
Test
Procedure
Results
GND
L or N
Input
Spark module
4 + 0
Test for voltage at terminals
L and N...............................................
Polarity and ground ............................
120 VAC
Not subject to polarity
Spark module
2 + 0
CGL1100AD*
Test for voltage at terminals...................
Polarity and ground................................
120 VAC
Not subject to polarity
Holder orifice
Verify gas pressure (WCP) ....................
Check orifice for debris ..........................
4
"
Natural
10
"
LP/Propane
Clean as needed.
Shut-off Valve
Verify gas supply is turned on.
Gas is turned on.
Shut-off Valve
Model CPL1100AD*
Verify gas supply is turned on.
Gas is turned on.
270
°
valve
Verify gas is supplied.
Orifice adjusted for Natural or LP.
Adjust set screw for simmer control .......
Refer to LP/Nat. conversion instructions.
Spark 270
°
switch
Unplug switch harness at rear of
range. Test for continuity at wire
terminals.
Switch in LITE position .........................
Switch in any other position..................
120 VAC
Continuity
Infinite
Spark switch
Model CGL1100AD*
Unplug switch harness at rear of
range. Test for continuity at wire
terminals.
Switch in LITE position .........................
Switch in any other position..................
120 VAC
Continuity
Infinite
Sealed burner
Verify gas is supplied .............................
Check for obstructions or
contamination in burner ports.................
Gas present.
Clean/remove any foreign objects.
Check ignitor for bending/cracking.
Open burner
Model CPR1100AD*,
LPR1115AD*,
CP31200AD*,
CG31200AD*
Verify gas is supplied .............................
Verify air shutter adjusted properly.........
Gas present.
Air shutter opening: .400" to .500".
Open burner
Models CPL1100AD*,
CGL1100AD*
Verify gas is supplied .............................
Verify air shutter adjusted properly.........
Gas present.
Air shutter opening: .435" to .565".
Open burner
Model CGR1110AD*
Verify gas is supplied .............................
Verify air shutter adjusted properly.........
Gas present.
Air shutter opening: .420" to .460".
Pilot burner
Models CPL1100AD*,
CPR1100AD*,
LPR1115AD*,
CP31200AD*,
CG31200AD*
Verify pilot selector cartridge is set to
the proper gas........................................
LP or Natural
Summary of Contents for CG31400ADW
Page 26: ...A 1 16023522 2004 Maytag Services Appendix A ...
Page 27: ... 2004 Maytag Services 16023522 A 2 Installation Instructions Models CP31200AD CG31200AD 2 ...
Page 38: ...B 1 16023522 2004 Maytag Services Appendix B ...
Page 39: ... 2004 Maytag Services 16023522 B 2 Use Instructions Models CP CG31200AD CPL1100AD CGL1100AD ...
Page 40: ...B 3 16023522 2004 Maytag Services Use Instructions Models CP CG31200AD CPL1100AD CGL1100AD ...
Page 49: ... 2004 Maytag Services 16023522 C 1 Appendix C ...