21
6 Operation
1. Normal operation
a) Before starting operation the following shall be checked:
•
Are pots, plants and soil mixture available in sufficient
quantity?
Care about the following
•
Soil transport
•
Plant feeding and unloading
•
Pot preparation
•
Use the shortest transport routes
b) Adjusting or shifting the pot turntable
•
Release hexagonal screw below the tray support.
•
Adjust the pot diameter by means of the ratch and the
extension.
•
Hand wheel at the shifting spindle
- Turn to the left
> pot holder goes down
- Turn to the right > pot holder goes up