23
6 Operation
1 Normal operation
a) Before starting operation the following shall be checked:
•
Are pots, plants and soil mixture available in sufficient
quantity?
Take care of the following:
•
Soil transport
•
Delivery and removal of plants
•
Pot preparation
•
Using the shortest transport routes
b) Adjusting or shifting the pot turntable
•
Release clamping lever below the box support.
•
Open the pot receptacle by moving the pot holding disk.