B-2
Maxtor Atlas 10K V
Table B-2
Transfer Period Factor Field Values When PARL = 0
OCh
Transfer period = 50 ns (Fast-20 data is latched using a transfer period
of less than or equal to 96 ns and greater than or equal to 50 ns).
0Dh – 18h
Transfer period = the period factor x 4 (Fast-20 data is latched using a
transfer period of less than or equal to 96 ns and greater than or equal
to 50 ns).
19h – 31h
Transfer period = the period factor x 4 (Fast-10 data is latched using a
transfer period of less than or equal to 196 ns and greater than or equal
to 100 ns).
32h - FFh
Transfer period = the period factor x 4 (Fast-5 data is latched using a
transfer period of less than or equal to 1020 ns and greater than or
equal to 200 ns).
Code
Description
00h – 09h
Reserved.
0Ah
Transfer period = 25 ns (Fast-40 data is latched every 25 ns).
0Bh
Transfer period = 30 ns (Fast-40 data is latched every 30 ns).
OCh
Transfer period = 50 ns (Fast-20 data is latched using a transfer period
of less than or equal to 96 ns and greater than or equal to 50 ns).
0Dh – 18h
Transfer period = the period factor x 4 (Fast-20 data is latched using a
transfer period of less than or equal to 96 ns and greater than or equal
to 50 ns).
19h – 31h
Transfer period = the period factor x 4 (Fast-10 data is latched using a
transfer period of less than or equal to 196 ns and greater than or equal
to 100 ns).
32h - FFh
Transfer period = the period factor x 4 (Fast-5 data is latched using a
transfer period of less than or equal to 1020 ns and greater than or
equal to 200 ns).
Summary of Contents for Atlas 10K V
Page 1: ...Maxtor Atlas 10K V Product Manual September 6 2005 Revision 3 PN 000001911...
Page 39: ...Maxtor Atlas 10K V 3 15...
Page 48: ...3 24 Maxtor Atlas 10K V Figure 3 9 Crosswise Airflow Cooling Below Unit Above Unit...
Page 125: ...Maxtor Atlas 10K V 5 67 21 23 Reserved...
Page 147: ...Maxtor Atlas 10K V 5 89 22 23 MSB Extent Length LSB...
Page 214: ...5 156 Maxtor Atlas 10K V...